Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›43--HANDLE ASSEMBLY,PUMP

U.S. Department Of Defense·Ohio

43--HANDLE ASSEMBLY,PUMP

Closes 12/1/2025$17k – $85kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The proposed procurement is for a HANDLE ASSEMBLY, PUMP, with a quantity of 17 units. The solicitation is an RFQ, and all responsible sources may submit a quote. The approved sources are 58163 2276-6 and 62228 2276-6. Delivery is required within 0168 days to DLA DISTRIBUTION JACKSONVILLE. Key points to consider: • The procurement is for a specific NSN (4320011468338) and quantity (17 units). • The solicitation is available electronically, and hard copies are not available. • Specifications, plans, or drawings are not available. • Quotes must be submitted electronically.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
11/20/2025
Closes
12/1/2025

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
333996
Solicitation №
SPE7M126T2377

Budget estimate

$17,000 – $85,000

The budget for this opportunity can be estimated based on the quantity and type of item being procured. The HANDLE ASSEMBLY, PUMP is a specific component, and its price may vary depending on the manufacturer and market conditions. Assuming an average price range of $1,000 to $5,000 per unit, the total budget for 17 units could be between $17,000 and $85,000. However, this is a rough estimate and may not reflect the actual budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 70%

43--PUMP,RECIPROCATING, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

70% match

43--PUMP UNIT,ROTARY

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

70% match

43--IMPELLER,PUMP,CENTRIFU

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

69% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/8/2026Opened 9/24/2026

U.S. Department Of Defense·Washington

69% match

43--PUMP,ROTARY

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·Oklahoma

69% match

NOUN: PUMP, ROTARY/ NSN: 4320-00-288-5375HS/ PN: 712180

Closes 11/13/2026Opened 10/5/2026

U.S. Department Of Defense·Oklahoma

68% match

PUMP ASSEMBLY, AFT - SPRRA127RA001

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

68% match

43--PUMP,CENTRIFUGAL

Closes 11/26/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

68% match

43--PUMP UNIT,ROTARY

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

68% match

29--PUMP ASSEMBLY

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

68% match

43--PARTS KIT,HYDRAULIC PU

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·United States of America

68% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

68% match

43--PUMP SUBASSEMBLY,AXIAL

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

68% match

43--PUMP,CENTRIFUGAL

Closes 11/1/2026Opened 10/18/2026

U.S. Department Of Defense·United States of America

68% match

43--HOUSING,LIQUID PUMP

Closes 11/17/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

67% match

43--PUMP,CENTRIFUGAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

67% match

43--PUMP,HYDRAULIC

Closes 11/1/2026Opened 10/22/2026

U.S. Department Of Defense·United States of America

67% match

17--PUMP ASSEMBLY,TRAILER

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

67% match

43--PUMP UNIT,CENTRIFUGAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

67% match

43--PUMP UNIT,CENTRIFUGAL

Closes 11/7/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

67% match

43--PUMP,ROTARY

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·California

67% match

43--PUMP,CENTRIFUGAL

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

67% match

43--PUMP UNIT,ROTARY

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

67% match

43--PUMP,ROTARY

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

67% match

43--SLEEVE,SHAFT,PUMP

Closes 11/11/2026Opened 10/27/2026