The City of Pomona is seeking a qualified general contractor to perform a full street‑rehabilitation package for Districts 2 and 3 (Phase I). The work includes removal and replacement of existing asphalt pavement, replacement of concrete curbs, sidewalks, and curb ramps, traffic‑control planning, utility adjustments, signage and striping, and compliance with prevailing‑wage, safety, and environmental requirements. The contract is valued at approximately $950 k and requires a 10 % bid bond, 100 % performance and payment bonds, and a 5 % retainage.
• Remove existing AC pavement, mill, and place new asphalt + rubber membrane interlayer.
• Install new PCC curbs, sidewalks, curb ramps, and related concrete work.
• Provide traffic‑control plans, electronic message signs, and striping/signage.
• Coordinate utility adjustments (manholes, water/gas valves, pull‑boxes, signal loop detectors).
• Meet Davis‑Bacon prevailing‑wage rules, 5 % retention, and liquidated damages of $1,600 per day for late completion.