The County of Gwinnett is soliciting competitive sealed bids for the design‑build improvement of the Cooper Road intersection with Moon Road and Hope Hollow Road. The scope includes earthwork, drainage, concrete, asphalt paving, curb & gutter, retaining walls, traffic‑signal and ATMS installation, sidewalk construction, striping, and water‑line installation over roughly 0.632 mi of right‑of‑way. Bidders must provide a 5 % bid bond, and be prepared to furnish 100 % performance and payment bonds, meeting strict bonding and insurance qualifications (A‑8 or better rating). Plans are viewable onsite or purchasable for $50 per set.
• Major work items: < 5,000 CY earthwork, 2,886 LF curb & gutter, 1,961 SY concrete, 1,880 LF storm‑drain pipe, 1,419 TN asphalt, 219 LF retaining wall.
• Mandatory bonding/insurance: 5 % bid bond; 100 % performance & payment bonds; A‑M Best A‑8+ rating required.
• Submission details: Two‑copy sealed bids marked “BL105‑26#”, due July 30 2026 2:50 PM at the County Purchasing Division, Lawrenceville, GA.