The Palm Beach County Water Utilities Department is seeking bids for the construction of the South County Reclaimed Water Transmission Pipeline Phase 2 and the Lyons Road Force Main between Yamato Road and L-38. The project involves the installation of approximately 8,154 linear feet of 24-inch Ductile Iron Pipe and 7,731 linear feet of 30-inch High Density Polyethylene pipe via Horizontal Directional Drill. The project also includes the construction of 114 linear feet through the Jack and Bore construction. The contractor will be responsible for providing all necessary materials, equipment, and labor to complete the project. The project requires the contractor to comply with all applicable federal, state, and local safety regulations, laws, and standards.
Some key aspects of the project include:
• Constructing the pipeline and force main
• Installing valves and fittings
• Performing pressure pipe testing and disinfection
• Providing traffic control and maintenance of traffic
• Coordinating with utility companies and other stakeholders
• Complying with environmental regulations and permits
The contractor will be required to submit a detailed outage plan and schedule for construction activities that will affect existing facilities. The contractor will also be responsible for providing temporary facilities and piping to minimize interference with the owner's operations and maintenance.
The project is expected to have a significant impact on the local community, and the contractor will be required to take necessary precautions to protect the public and the environment.
The contractor will be paid based on a unit-price contract, and the contract price will include all costs associated with completing the project, including labor, materials, equipment, and permits.