Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Montana
  4. ›Civil Engineering
  5. ›Butte-Silver Bow 2026 Cured in Place Pipe (CIPP) Project

City and County of Butte-Silver Bow·Montana

Butte-Silver Bow 2026 Cured in Place Pipe (CIPP) Project

Closes 8/26/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City-County of Butte-Silver Bow is seeking qualified contractors to submit bids for the Butte-Silver Bow 2026 Cured in Place Pipe (CIPP) Project. The project involves rehabilitating approximately 9,060 linear feet of sanitary sewer pipe using CIPP lining. The work includes furnishing and installing CIPP lining in compliance with the attached bid specification, reconnecting all active sewer services, and performing CCTV inspections before and after liner installation. The project is located in Butte, Montana, and the bid specification includes twenty-eight distinct pipe segments. • The project requires the contractor to verify all pipe diameters, pipe lengths, access manhole depths, and the number of active service connections prior to installation. • The contractor must provide bypass pumping for the sanitary sewer reach(s) upstream of the CIPP lining reach. • The finished liner shall be continuous for the entire length of the installation run between manholes and shall be free of visual defects. • The contractor shall remove all protruding taps identified during the pre-installation CCTV inspection or shown on the plan sheets prior to CIPP lining. • The contractor shall perform dye testing to determine whether a service is active or should be abandoned if the status of a service is questionable.

Attached files

Contact

(406) 782-5220

Key dates

Opened
8/6/2026
Pre-bid meeting
8/12/2026Mandatory
Closes
8/26/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and industry standards. The project involves rehabilitating approximately 9,060 linear feet of sanitary sewer pipe using CIPP lining. The cost of CIPP lining can vary depending on factors such as pipe diameter, length, and location. However, a rough estimate for the cost of CIPP lining can be around $50 to $200 per linear foot, depending on the complexity of the project. Based on this, the total cost of the project could be estimated to be around $452,500 to $1,812,000. Additionally, the cost of bypass pumping, CCTV inspections, and other related work should also be considered. Therefore, a more realistic estimate for the budget could be around $500,000 to $2,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Marysville, Ohio·Ohio

Top match · 75%

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

Buy Board Purchasing Cooperative·Texas

75% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)

Closes 11/12/2026Opened 9/4/2026

Buy Board Purchasing Cooperative·Texas

74% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Ultraviolet-Light Cured Products)

Closes 11/12/2026Opened 9/4/2026

City of West Des Moines·Iowa

74% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Greenwood Metropolitan District·South Carolina

72% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City Utilities·Indiana

72% match

77635 - 2026 CIPP Pkg 1 Small and Medium Diameter

Closes 11/5/2026Opened 10/16/2026

City of Redlands·California

71% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Georgia City of Sandy Springs·Georgia

71% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

West County Wastewater·California

71% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Appleton, WI·Wisconsin

70% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

City of Chula Vista·California

70% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

Delaware County Regional Sewer District·Ohio

70% match

2025 Sewer Rehabilitation Project

Closes 11/17/2026Opened 10/13/2026

City of Shawnee·Kansas

70% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Bellevue·Washington

69% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

Georgia Brunswick‑Glynn County Joint Water and Sewer Commission·Georgia

68% match

ITB No. 27-006 Construction Services for Basin 4001 and 4013 CIPP Rehabilitation

Closes 11/10/2026Opened 10/7/2026

Saline County·Kansas

68% match

2026 Pipe Lining Project

Closes 11/24/2026Opened 10/19/2026

City of Beaumont·California

68% match

IFB 26-21 ONGOING PIPELINE REPLACEMENT (CIP WW26-12)

Closes 12/1/2026Opened 10/22/2026

Gary Sanitary District·Indiana

68% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

Connecticut Town of Fairfield·Connecticut

68% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

City of Braintree·Massachusetts

68% match

Sewer System Rehabilitation - Year 13

Closes 11/5/2026Opened 10/14/2026

Augusta County Service Authority dba Augusta Water·Virginia

68% match

ITB 2702 Augusta Water Collection System Rehabilitation

Closes 12/3/2026Opened 10/29/2026

City of Newberg·Oregon

67% match

NBG Pipe 2026

Closes 11/10/2026Opened 10/20/2026

California Department of Transportation·California

67% match

Reinforced concrete pipe trenchless installation method.

Closes 11/10/2026Opened 10/5/2026

Oregon Tualatin Valley Water District·Oregon

67% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of San Bernardino·California

67% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026