Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Missouri guideMissouri Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Missouri
  4. ›Manufacturing
  5. ›Production Scale Wire Drawing Cell

University of Missouri System·Missouri

Production Scale Wire Drawing Cell

Closes 5/8/2026$200k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of Missouri is seeking bids for the furnishing and delivery of a production scale wire drawing cell. The equipment should include an 18” diameter horizontal draw block, wire straightener, loose coil payoff, and motorized roll pointer. The system should be able to operate on 208V or 480V and meet technical requirements for materials and reduction amounts specified. The supplier is required to provide recommendations on reduction per pass and the corresponding number of die passes to achieve the reduction goals set for each of the 5 specified material classes. Some key features of the equipment include: • 18” diameter horizontal draw block with adequate hard facing for wear resistance • Wire straightener with multi-grooved rolls in both horizontal and vertical planes • Loose coil payoff with a vertical shaft braked system and drag brake • Motorized roll pointer capable of pointing solid materials • Ability to draw low and high carbon steel alloys, titanium alloys, cuprous alloys, and aluminum alloys from a maximum starting OD of 6 mm to a final diameter of 1 mm

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Amanda Barnes

[email protected]

(573) 884-8695

Key dates

Opened
4/16/2026
Questions due
4/23/2026
Closes
5/8/2026

Last updated

Details

Type
Invitation for Bid
Industry
Manufacturing
NAICS
333512
Solicitation №
26-0131

Budget estimate

$200,000 – $500,000

The budget for this opportunity is likely to be in the range of $200,000 to $500,000, considering the complexity and technical requirements of the equipment. The cost of the equipment, installation, and startup and on-site training will contribute to the overall budget. The fact that priority consideration may be given to units manufactured and sold within the United States of America may also impact the budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Virginia

Top match · 61%

CELL, ASSEMBLY, OPTICAL

Closes 11/16/2026Opened 9/25/2026

U.S. Department Of Energy·California

60% match

Large Format Wire Electrical Discharge Machining (EDM) System

Closes 11/18/2026Opened 10/28/2026

U.S. Department Of Defense·Virginia

59% match

WIRE ROPE ASSEMBLY

Closes 12/24/2026Opened 12/9/2025

U.S. Department Of Defense·Pennsylvania

58% match

CELL, ASSEMBLY, OPTICAL

Closes 11/16/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

58% match

40--WIRE ROPE ASSEMBLY,SIN

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·Oklahoma

58% match

59--RESISTOR,VARIABLE,WIRE

Closes 11/10/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

58% match

59--CONNECTOR,PLUG,ELECTRI

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

58% match

SCALE,WEIGHING

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·New Jersey

58% match

Wire Support Springs

Closes 11/4/2026Opened 10/20/2025

U.S. Department Of Defense·United States of America

58% match

59--RESISTOR,VARIABLE,WIRE

Closes 11/9/2026Opened 10/30/2026

U.S. Department Of Defense·Utah

57% match

FD2020-22-00101

Closes 10/31/2026Opened 11/2/2021

U.S. Department Of Defense·United States of America

57% match

CIRCUIT CARD ASSY

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·Georgia

57% match

Circuit Card Assembly

Closes 11/11/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

57% match

CIRCUIT CARD ASSEMB

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

57% match

44--CELL,COLLECTOR

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Vermont

56% match

CIRCUIT CARD ASSEMB

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

56% match

CIRCUIT CARD ASSEMB

Closes 11/30/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

56% match

CIRCUIT CARD ASSEMB

Closes 11/27/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

56% match

CIRCUIT CARD ASSEMB

Closes 11/6/2026Opened 10/7/2026

Corrections and Community Supervision, NYS Dept. of·New York

56% match

ARC FLASH

Closes 12/9/2026Opened 8/12/2026

U.S. National Institutes of Health·United States of America

56% match

BRAIN Initiative: Development and Validation of Novel Tools and New Approaches for Neuroscience Research

Closes 6/9/2027Opened 6/24/2026

U.S. Department Of Defense·United States of America

56% match

66--WATTMETER

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

56% match

59--CIRCUIT CARD ASSEMBLY

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

56% match

CIRCUIT CARD ASSEMB

Closes 12/3/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

56% match

CIRCUIT CARD ASSEMB

Closes 11/30/2026Opened 10/29/2026