The U.S. Geological Survey (USGS) is conducting market research to determine the availability of qualified businesses capable of providing a new Power Take-Off (PTO) and repair of the needed TH60 drill rig. The PTO is used to transfer the truck engine's power via a transfer case to run drilling components. The condition of the current PTO is beyond repair, and market research has shown that parts to repair/refurbish the current PTO for this specific rig are no longer made. The original manufacturer, Fabco, currently has an unused PTO in their inventory that will be suitable as a replacement part.
The scope of work includes the purchase of a new PTO and repair of the needed TH60 drill rig. The PTO requirements include a single-speed transfer case designed for full-time all-wheel drive applications, available with or without PTO output, hydraulic pump output, and proportional differential. The PTO must also meet specific lubrication, physical size, dimensions, and compatibility requirements.
The USGS is seeking responses from qualified businesses that can provide the required PTO and repair services. Interested parties must submit a brochure and/or technical specifications detailing their ability to meet the required specifications and statement of work.
Key points to consider:
• The PTO must be a single-speed transfer case designed for full-time all-wheel drive applications.
• The PTO must meet specific lubrication, physical size, dimensions, and compatibility requirements.
• The scope of work includes the purchase of a new PTO and repair of the needed TH60 drill rig.
• The USGS is seeking responses from qualified businesses that can provide the required PTO and repair services.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.