Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›S Co RCWM Pipeline Ph 2 & Lyons Rd FM, Yamato to L-38

Palm Beach County Water Utilities Department·Florida

S Co RCWM Pipeline Ph 2 & Lyons Rd FM, Yamato to L-38

Closes 5/6/2026$2M – $5MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Palm Beach County Water Utilities Department is seeking a contractor to construct the South County Reclaimed Water Transmission Pipeline Phase 2 and the Lyons Road Force Main between Yamato Road and L-38. The project involves the construction of approximately 8,154 linear feet of 24-inch Ductile Iron Pipe (DIP) via open cut and 7,731 linear feet of 30-inch High Density Polyethylene (HDPE) pipe via Horizontal Directional Drill (HDD). The contractor will be responsible for providing all necessary materials, equipment, and labor to complete the project, including excavation, pipe laying, and backfilling. The project also includes the construction of 114 linear feet through the Jack and Bore construction. • The contractor must comply with all applicable federal, state, and local safety regulations, laws, and standards. • The contractor must provide a traffic control plan and maintain safe access to the site for pedestrians and vehicles. • The contractor must coordinate with other contractors and utilities to minimize interference with existing facilities. • The contractor must provide a detailed outage plan and schedule for any outages or service connections. • The contractor must test and place the completed project in operation. The project requires a single unit-price contract, and the contractor must submit applications for payment in accordance with the contract documents. The contract price includes all costs for completing the project, including home office overhead, project management, professional services, bonds, insurance, permits, and taxes.

Attached files

Contact

Henry Melendez(Buyer)

[email protected]

(561) 493-6120

Key dates

Opened
4/29/2026
Closes
5/6/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
IFB-720-WUD 23-053 & 24-028-3

Budget estimate

$2,000,000 – $5,000,000

The budget for this project can be estimated based on the scope of work and the materials required. The project involves the construction of approximately 8,154 linear feet of 24-inch Ductile Iron Pipe (DIP) and 7,731 linear feet of 30-inch High Density Polyethylene (HDPE) pipe. The cost of materials, labor, and equipment can be estimated based on industry standards and market prices. Assuming an average cost of $100 per linear foot for DIP and $80 per linear foot for HDPE, the total material cost would be approximately $815,400 for DIP and $619,480 for HDPE. Labor costs, equipment rental, and other expenses would add to the total cost. Based on these estimates, the total budget for the project could be in the range of $2 million to $5 million.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Eastern Municipal Water District·California

Top match · 60%

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

Power Authority of New York·New York

60% match

Natural Gas Transportation- Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

Tarrant Regional Water District·Texas

58% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of Daytona Beach·Florida

58% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

58% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

West County Wastewater·California

58% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Riverside·California

57% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of Energy·Illinois

57% match

PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

Closes 11/19/2026Opened 10/8/2026

City of Columbus Ohio·Ohio

56% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

Oregon Tualatin Valley Water District·Oregon

56% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Rancho Palos Verdes·California

56% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

LA Water & Power·California

56% match

137000 GROUT, MASTER FLOW

Closes 11/19/2026Opened 10/27/2026

Power Authority of New York·New York

56% match

Spot Natural Gas Supply - Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

City of Key West·Florida

56% match

CDBG-MIT – Trenchless Installation of Utilities Across Fleming Channel

Closes 12/2/2026Opened 10/15/2026

City of Columbus·Ohio

56% match

PAWP Wellfield Development

Closes 11/4/2026Opened 10/5/2026

U.S. Department Of Defense·California

56% match

17--HOSE,MANIFOLD TO CY

Closes 11/8/2026Opened 10/28/2026

The City of Columbus·Ohio

56% match

RFQ033812 - PAWP Wellfield Development

Closes 11/4/2026Opened 10/7/2026

City of Des Moines - Iowa·Iowa

56% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

Butler County·Ohio

56% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

56% match

FRSMP277009/JLM-Lighting Phase 2

Closes 12/2/2026Opened 10/23/2026

City of Redlands·California

56% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Village of Cary·Illinois

56% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

City of Austin·Texas

56% match

West Congress (Radam/St. Elmo) Water & WW Pipeline Renewal

Rolling / TBD closeOpened 7/13/2026

U.S. Department Of Defense·United States of America

56% match

47--MANIFOLD,HYDRAULIC

Closes 11/1/2026Opened 10/20/2026

Clermont County - Board of Commissioners·Ohio

56% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026