The Palm Beach County Water Utilities Department is seeking a contractor to construct the South County Reclaimed Water Transmission Pipeline Phase 2 and the Lyons Road Force Main between Yamato Road and L-38. The project involves the construction of approximately 8,154 linear feet of 24-inch Ductile Iron Pipe (DIP) via open cut and 7,731 linear feet of 30-inch High Density Polyethylene (HDPE) pipe via Horizontal Directional Drill (HDD). The contractor will be responsible for providing all necessary materials, equipment, and labor to complete the project, including excavation, pipe laying, and backfilling. The project also includes the construction of 114 linear feet through the Jack and Bore construction.
• The contractor must comply with all applicable federal, state, and local safety regulations, laws, and standards.
• The contractor must provide a traffic control plan and maintain safe access to the site for pedestrians and vehicles.
• The contractor must coordinate with other contractors and utilities to minimize interference with existing facilities.
• The contractor must provide a detailed outage plan and schedule for any outages or service connections.
• The contractor must test and place the completed project in operation.
The project requires a single unit-price contract, and the contractor must submit applications for payment in accordance with the contract documents. The contract price includes all costs for completing the project, including home office overhead, project management, professional services, bonds, insurance, permits, and taxes.