Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›P-8A Poseidon Manufacturing and Prototyping Support at…

U.S. Department Of Defense·Maryland

P-8A Poseidon Manufacturing and Prototyping Support at Cecil Field, Jacksonville Florida

Closes 5/29/2026$5M – $250MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Naval Air Systems Command (NAVAIR) is seeking capability statements from potential contractors to support the manufacturing, assembly, and integration of mission-ready prototype kits, specialized mission equipment racks, and other emergent structural and electrical manufacturing needs for the P-8A Poseidon aircraft at Cecil Field in Jacksonville, Florida. The contractor must possess a comprehensive range of capabilities, including CNC programming, structural fabrication, and rapid prototyping. The contractor must also provide wiring and electrical integration, rack assembly and integration, and Modification (MOD) installation support. • The contractor must be equipped with advanced processes, including alodine, priming, painting, and anodizing. • The contractor must have experience with fiber optic manufacturing, wire marking, braiding, welding, and waterjet manufacturing. • The contractor must be AS9100 Rev D-certified and employ personnel cleared at the secret-level for rapid, on-aircraft tasking. • The contractor must provide program management, logistics, and QA on-site to support and report manufacturing status. • The contractor's proximity to Cecil Field must enable hands-on collaboration and fit-check verification with the Special Missions Fleet Support Team (FST) engineers.

Attached files

Contact

Samantha Ragan

[email protected]

Key dates

Opened
4/22/2026
Closes
5/29/2026
Duration
60 months

Last updated

Details

Type
Request for Information
Industry
Aerospace and Defense
NAICS
336413
Solicitation №
N00019-27-RFPREQ-APM290-0039

Budget estimate

$5,000,000 – $250,000,000

The budget for this contract can be estimated based on the scope of work and the requirements of the contractor. The contractor must provide a comprehensive range of capabilities, including CNC programming, structural fabrication, and rapid prototyping. The contractor must also provide wiring and electrical integration, rack assembly and integration, and Modification (MOD) installation support. Given the complexity and scope of the work, the budget could range from $10 million to $50 million per year, depending on the specific requirements of the contract and the capabilities of the contractor. The total budget for the 5-year contract period could range from $50 million to $250 million. The factors that may influence the likely payment range include the number of prototype kits and specialized mission equipment racks required, the complexity of the manufacturing and integration work, and the level of support required for the P-8A Poseidon aircraft.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Texas

Top match · 69%

P-8A Poseidon APY-10 Field Service Representative (FSR) Support

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Florida

68% match

P-8A OFT Technical Refresh

Closes 11/30/2026Opened 10/28/2026

City of Hollywood·Florida

66% match

Rapid Field Overhaul Kits and Field Labor for Compressor Units

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·Arkansas

65% match

Production of Small Unmanned Aircraft Systems (sUAS) Lethality Payloads at Pine Bluff Arsenal

Closes 12/14/2026Opened 10/30/2026

U.S. Department Of Defense·Ohio

65% match

LIGHT,LANDING,AIRCR

Closes 11/20/2026Opened 10/20/2026

U.S. Department Of Defense·Florida

65% match

P-8 Radar Data Generation (RDG) Tech Refresh Spares

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·California

64% match

P-8A and E-7A Inlet Cowl Assembly Units

Closes 11/9/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

64% match

P-8A Australian APY-10 Radar Regional Repair Facility

Closes 11/10/2026Opened 10/26/2026

U.S. Department Of Defense·Alabama

64% match

Call for Solutions (CFS): Drone Marketplace Onboarding of US Payloads, Software, Components, and Enablers/Accessories

Closes 8/3/2031Opened 8/4/2026

U.S. Department Of Defense·Utah

64% match

PIGA Float Assembly Repair Program

Closes 12/3/2026Opened 10/5/2026

U.S. Department Of Commerce·Maryland

64% match

NOAA NOS OCS Coast Pilot Production System- Maintenance and Support

Closes 11/6/2026Opened 10/27/2026

U.S. Department Of Defense·Nebraska

64% match

API 653 Fuel Tank Repairs and Maintenance - Eielson AFB, Alaska

Closes 8/3/2027Opened 8/3/2026

U.S. Department Of Defense·Washington

64% match

P-8A Ground Vibration Testing

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

64% match

16--PANEL ASSEMBLY

Closes 11/22/2026Opened 10/8/2026

Florida Department of Transportation (FDOT)·Florida

64% match

Flagler Scale Replacement

Closes 11/19/2026Opened 10/28/2026

U.S. Department Of Defense·Utah

63% match

HMIT Test Stand Support

Closes 11/18/2026Opened 10/19/2026

U.S. Department Of Homeland Security·Connecticut

63% match

Ballfield Maintenance

Closes 11/18/2026Opened 10/30/2026

U.S. Department Of Defense·New Jersey

63% match

P-25A Hand Pump Kits

Closes 11/13/2026Opened 10/29/2026

U.S. Department Of Defense·New Mexico

63% match

Special Notice - Announcement of Industry Day - Progressive Design-Build (PDB) Other Transaction (OT) for FY28 High Speed Test Track, Holloman Air Force Base, Otero County, Mexico

Closes 10/27/2027Opened 10/27/2026

U.S. Department Of Defense·Illinois

63% match

DRS M7A1 HDPE PLATFORM

Closes 11/6/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

63% match

APU ELECTRONIC

Closes 11/20/2026Opened 10/21/2026

U.S. Department Of Defense·New Jersey

63% match

Primer Feed Mechanisms (PFMs)

Closes 11/18/2026Opened 4/21/2026

Texas Department of Public Safety·Texas

63% match

Facility Industrial Fan

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·Georgia

63% match

F-15E Flat Panel Multipurpose Display (FPMPD)

Closes 11/12/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

63% match

30--CONTROL ASSEMBLY,AI, IN REPAIR/MODIFICATION OF

Closes 12/13/2026Opened 10/29/2026