Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Kentucky guideKentucky Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an RFPChoosing and Responding to Government Bids
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Kentucky
  4. ›Construction
  5. ›Design Build Interative Water Splash Pad at Anthony Brooks…

City of Henderson·Kentucky

Design Build Interative Water Splash Pad at Anthony Brooks Park

Closes 10/13/2026$150k – $350kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Henderson, Kentucky is soliciting design‑build proposals for a new interactive water splash pad at Anthony Brooks Park (817 Madison St.). The contractor must provide full design, permitting, civil/structural work, water and electrical systems, installation of a 1,250 sq ft non‑recirculating splash pad, and related site work. The project is funded by the Land and Water Conservation Fund and must comply with Buy‑America requirements, ADA standards, and local permitting. A mandatory site visit is required; proposals are due 4 PM on 13 Oct 2026. • Scope: complete turnkey design, engineering, grading, utilities, installation, testing, and warranty for a 1,250 sq ft splash pad. • Location: Anthony Brooks Park, Henderson, KY (817 Madison St.). • Schedule: Questions due 8 Oct 2026; proposals due 13 Oct 2026; award expected shortly after. Construction start TBD. • Requirements: Obtain all permits, provide backflow protection, pressure regulation, electrical controls, and a lockable equipment enclosure. Minimum four above‑ground and multiple ground spray features; water flow ≤ 100 GPM. • Mandatory site visit (date not specified). • Payment: Net 30 days after satisfactory installation; contract length tied to construction completion (estimated several months). • Evaluation: technical design, compliance, cost, and ability to meet safety/ADA standards.

Attached files

Contact

Amy L. Finley(Finance Manager)

[email protected]

(270) 831-1200

Key dates

Opened
9/22/2026
Questions due
10/8/2026
Closes
10/13/2026

Last updated

Details

Type
Request for Proposal
Industry
Construction
NAICS
238990
Solicitation №
RFP 26-32

Budget estimate

$150,000 – $350,000

Based on industry benchmarks for public‑sector water‑play installations (approximately $150‑$250 per square foot for design‑build splash pads, plus engineering and permitting fees), a 1,250 sq ft facility is expected to cost between $187,500 and $312,500. Additional costs for site grading, utility connections, and a lockable equipment enclosure could push the upper bound toward $350,000. Therefore the anticipated contractor revenue range is roughly $150 k – $350 k, depending on design complexity and material selections.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

We’re still matching similar opportunities to this one — check back soon.

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.