The Blount County TN Government, on behalf of the Board of Education, is seeking bids for the reconstruction of high school tracks at Heritage High School and William Blount High School locations. The project includes the removal and disposal of the existing track, concrete, asphalt, and base, and the installation of new aggregate base material, concrete curbs, geo-textile fabric, and asphalt. The project also includes the delivery and installation of a track mat, structural spray, and seal coat, as well as the installation of new fencing and gates. Bidders are required to submit their responses through the online bidding system, and a pre-bid meeting will be held on April 7, 2026, at 9:00 AM.
• The project requires the removal and disposal of the existing track, concrete, asphalt, and base.
• The installation of new aggregate base material, concrete curbs, geo-textile fabric, and asphalt is required.
• The delivery and installation of a track mat, structural spray, and seal coat are required.
• The installation of new fencing and gates is required.
• Bidders must submit their responses through the online bidding system.
• A pre-bid meeting will be held on April 7, 2026, at 9:00 AM.