Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›PUMP UNIT ASSEMBLY

U.S. Department Of Defense·Pennsylvania

PUMP UNIT ASSEMBLY

Closes 7/7/2026$100k – $500kRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The United States Navy is seeking a contractor to repair a PUMP UNIT ASSEMBLY. The contract will require the contractor to perform all inspection and testing requirements as specified in the original manufacturer's specifications and drawings. The contractor must also provide a quote that includes the unit price, total price, and repair turnaround time. The Government is seeking a repair turnaround time of 124 days. Some key points to consider: • The contract will be a firm-fixed-price contract. • The contractor must obtain final inspection and acceptance by the Government for all assets within the repair turnaround time. • The contractor is responsible for the performance of all inspection requirements as specified in the contract. • The Government reserves the right to perform any inspections deemed necessary to assure supplies and services conform to prescribed requirements. • The contractor must keep complete and accurate records of all inspection work and make them available to the Government during the performance of the contract and for a period of 365 calendar days after final delivery of supplies.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kailyn M. Muro(Procurement Contracting Officer)

[email protected]

(717) 605-1350

Key dates

Opened
6/30/2026
Closes
7/7/2026
Duration
124 days

Last updated

Details

Type
Request for Quotation
Industry
Manufacturing
NAICS
332919
Solicitation №
N0010426QJB64

Budget estimate

$100,000 – $500,000

The budget for this contract is difficult to estimate without more information about the specific requirements and the number of units to be repaired. However, based on the fact that the contract is for the repair of a PUMP UNIT ASSEMBLY, it is likely that the budget will be in the range of $100,000 to $500,000. The budget will depend on the complexity of the repair, the number of units to be repaired, and the labor and materials required to complete the repair. Factors that may influence the likely payment range include: - The complexity of the repair - The number of units to be repaired - The labor and materials required to complete the repair - The level of competition for the contract

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 68%

29--PUMP ASSEMBLY

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

66% match

PUMP ASSEMBLY

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

65% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

U.S. Department Of Defense·United States of America

65% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/15/2026

U.S. Department Of Defense·Oklahoma

65% match

PUMP ASSEMBLY, AFT - SPRRA127RA001

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

65% match

VACUUM PUMP UNIT

Closes 11/2/2026Opened 10/1/2026

U.S. Department Of Defense·United States of America

64% match

PUMP UNIT,ROTARY

Closes 11/16/2026Opened 10/19/2026

U.S. Department Of Defense·Pennsylvania

64% match

16--COOLANT PUMP ASSEMB, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/15/2026

U.S. Department Of Defense·United States of America

64% match

PUMP UNIT,ROTARY

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·Michigan

64% match

Pump Unit, Hydraulic

Closes 11/3/2026Opened 10/15/2026

U.S. Department Of Defense·Maine

64% match

IMPELLER PUMP ASSEMBLY

Closes 11/5/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

63% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

U.S. Department Of Defense·United States of America

63% match

17--PUMP ASSEMBLY,TRAILER

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

63% match

PUMP UNIT,CENTRIFUG

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

63% match

PUMP UNIT, FUEL TRAN

Closes 11/23/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

63% match

25--PUMP ASSEMBLY,POWER ST

Closes 11/5/2026Opened 10/26/2026

Missouri Department of Transportation (MoDOT)·Missouri

63% match

Titan 345-556A Pump Assemblies

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Justice·Indiana

62% match

FCC TERRE HAUTE Heating Condensate Pumps

Closes 11/2/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

62% match

PUMP UNIT,CTFGL

Closes 11/2/2026Opened 10/16/2026

U.S. Department Of Defense·United States of America

62% match

43--PUMP UNIT,ROTARY

Closes 11/1/2026Opened 10/20/2026

U.S. Department Of Defense·Maine

62% match

43--HOUSING,LIQUID PUMP

Closes 11/17/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

62% match

43--PUMP UNIT,ROTARY

Closes 11/4/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

62% match

16--PUMP,AXIAL PISTONS - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/9/2026

U.S. Department Of Defense·Oklahoma

62% match

NOUN: PUMP, ROTARY/ NSN: 4320-00-288-5375HS/ PN: 712180

Closes 11/13/2026Opened 10/5/2026

City of Branson·Missouri

62% match

RFB 2900-16 Annual Lift Station Pump Rebuilds Replacements 2027

Closes 11/20/2026Opened 10/20/2026