The Commonwealth of Kentucky, Division of Water, is seeking bids for the rehabilitation of the Willisburg Lake Dam. The project includes the construction of a reinforced concrete auxiliary spillway, a reinforced concrete floodwall, and a rockfill stability berm. The contractor will also be responsible for site preparation, erosion and sedimentation control, slope construction and protection, and site grading and restoration work.
• The project requires a Contractor-designed Water Diversion Plan.
• The contractor must demolish existing storm sewer infrastructure, raw water lines, and concrete ditches.
• The contractor must also install new raw water intake lines within the principal spillway culvert.
• The project includes a new low-level drawdown valve and remediation of concrete cracking and seepage in the existing principal spillway culvert.
• The contractor must ensure site safety, water control, site security, traffic control, and site cleanup.