Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Construction
  5. ›Cure-In-Place-Pipe Point Repair Equipment & Consumables

San Antonio Water System·Texas

Cure-In-Place-Pipe Point Repair Equipment & Consumables

Closes 4/16/2026$100k – $500kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The San Antonio Water System is soliciting bids for the purchase of equipment and consumables for the repair and reconstruction of existing service lateral or sanitary sewer main lines without excavation or bypass pumping. The equipment and consumables must be able to provide a cure-in-place pipe point repair installation that is impermeable, continuous, tight-fitting, and corrosion resistant. The bid includes the provision of a resin impregnated flexible fiberglass mat that can be positioned in the existing service lateral or sewer main at the defect to be repaired, and cured by ambient temperature. • The equipment and consumables must meet the minimum requirements for the annual agreement. • The bidder must be able to provide the equipment and consumables at the price(s) and upon the terms and conditions contained in the specifications. • The period of acceptance of this bid will be 90 calendar days after the bid opening date. • The San Antonio Water System Purchasing Department is willing to assist any bidder(s) in the interpretation of bid provisions or explanation of how bid forms are to be completed.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Anthony Rubin(Purchasing Department)

[email protected]

(210) 233-3815

Key dates

Opened
3/11/2026
Questions due
3/18/2026
Closes
4/16/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
26-1070 Addendum 2

Budget estimate

$100,000 – $500,000

The budget for this opportunity is likely to be in the range of $100,000 to $500,000, considering the scope of the project and the equipment and consumables required. The actual budget will depend on the bidder's prices and the terms and conditions of the contract. Factors that may influence the likely payment range include the complexity of the repairs, the quantity of equipment and consumables required, and the bidder's experience and reputation in the industry.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Buy Board Purchasing Cooperative·Texas

Top match · 74%

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)

Closes 11/12/2026Opened 9/4/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

74% match

CONSUMABLES PIPE WRAP THREAD SEALANT MATERIAL DROP PIPE REPAIR

Closes 11/9/2026Opened 10/28/2026

Buy Board Purchasing Cooperative·Texas

74% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Ultraviolet-Light Cured Products)

Closes 11/12/2026Opened 9/4/2026

City of Marysville, Ohio·Ohio

69% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

U.S. Department Of Defense·New Hampshire

68% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

City of Appleton, WI·Wisconsin

68% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

School District of Philadelphia (General Opportunities)·Pennsylvania

68% match

On Call Piping Repairs

Closes 1/12/2027Opened 10/30/2026

City of Bellevue·Washington

66% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

Greenwood Metropolitan District·South Carolina

66% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

Georgia City of Sandy Springs·Georgia

66% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Chula Vista·California

66% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of West Des Moines·Iowa

65% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of Charlotte·North Carolina

65% match

Pipe Patching Services

Rolling / TBD closeOpened 6/29/2026

City of Philadelphia·Pennsylvania

65% match

Sewing Machine Repair

Closes 11/9/2026Opened 10/26/2026

U.S. Department Of Defense·Missouri

65% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

U.S. Department Of Defense·United States of America

65% match

47--PLUG,TUBE REPAIR

Closes 11/8/2026Opened 10/27/2026

Greater Naples Fire Rescue District·Florida

65% match

Annual Plumbing Preventive Maintenance and Repair Services

Closes 11/3/2026Opened 10/20/2026

U.S. Department Of Defense·United States of America

64% match

43--PUMP,CENTRIFUGAL - AND SIMILAR REPLACEMENT PARTS, IN REPAIR/MODIFICATION OF

Closes 11/16/2026Opened 10/15/2026

Humble ISD·Texas

64% match

POOL MAINTENANCE & REPAIR SERVICES

Closes 11/12/2026Opened 10/12/2026

City of South San Francisco·California

64% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

City of Somers Point·New Jersey

64% match

Sewer Pump Station Maintenance

Closes 11/10/2026Opened 10/9/2026

City of San Bernardino·California

64% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

City of Shawnee·Kansas

64% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Rancho Palos Verdes·California

64% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

City of San Antonio·Texas

64% match

6100019820 Carbon Steel Pipe and Accessories

Closes 11/13/2026Opened 10/28/2026