The City of Norwalk is seeking qualified contractors to perform a comprehensive street rehabilitation program in Zones 5 and 6 (Project No 7944). The work includes cold‑milling, asphalt overlay (including ARAM and HMA), slurry seal, utility adjustments, curb‑gutter replacement, striping, signage, and associated traffic‑control and public‑notification services. The contract is a fixed‑price, unit‑price bid valued at roughly $4.5 M, with a construction window of 70 working days (85 days if the Zone 6 alternate is awarded) to be completed between May 1 and September 1. Bidders must provide a 10 % bid bond, appropriate performance and payment bonds, and meet extensive insurance, prevailing‑wage, and environmental compliance requirements.
• Cold‑mill up to 1.5 in. depth, followed by ARAM/HMA overlays and slurry seal across approximately 1.1 million sf total.
• Full traffic‑control, public‑notification, and utility coordination (Dig‑Alert, utility owners, etc.).
• Concrete curb‑gutter, ADA ramp work, striping, signage, and final clean‑up with strict liquidated‑damage provisions ($5,000 per day).