This solicitation is a change order (Change Order #1) to an existing contract for the Office of Mines and Minerals. The amendment modifies the primary lake outlet structure: the original precast concrete structure will be replaced with a larger precast box structure, and the inlet pipe will be upgraded from a concrete pipe to a longer ductile‑iron pipe. The work falls under NIGP 912‑44 (Excavation Services) and is classified as an amendment/change order with no dollar increase indicated.
• Replace existing precast concrete structure with larger precast box.
• Switch inlet piping from concrete to longer ductile‑iron pipe.
• Scope limited to structural modification and associated excavation.