Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›S Co RCWM Pipeline Ph 2 & Lyons Rd FM, Yamato to L-38

Palm Beach County Water Utilities Department·Florida

S Co RCWM Pipeline Ph 2 & Lyons Rd FM, Yamato to L-38

Closes 5/20/2026$5M – $15MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves the construction of a reclaimed water transmission pipeline and a force main in Palm Beach County, Florida. The scope of work includes the installation of approximately 8,154 linear feet of 24-inch Ductile Iron Pipe and 7,731 linear feet of 30-inch High Density Polyethylene pipe. The project also includes the construction of 114 linear feet of 24-inch and 30-inch pipe via Jack and Bore method. The contractor will be responsible for providing all necessary materials, equipment, and labor to complete the project. The project requires compliance with various regulations and permits, including a Palm Beach County Land Development Permit. Some key aspects of the project include: • Construction of a reclaimed water transmission pipeline and a force main • Installation of Ductile Iron Pipe and High Density Polyethylene pipe • Compliance with regulations and permits, including a Palm Beach County Land Development Permit • Provision of all necessary materials, equipment, and labor to complete the project • Coordination with the owner and other stakeholders to ensure minimal disruption to existing facilities and the public

Attached files

Contact

Henry Melendez(Buyer)

[email protected]

(561) 493-6120

Key dates

Opened
5/4/2026
Closes
5/20/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
IFB-720-WUD 23-053 & 24-028-4

Budget estimate

$5,000,000 – $15,000,000

The budget for this project can be estimated based on the scope of work and the materials involved. The construction of approximately 8,154 linear feet of 24-inch Ductile Iron Pipe and 7,731 linear feet of 30-inch High Density Polyethylene pipe is a significant undertaking that requires substantial resources. The cost of materials, labor, and equipment will be considerable. Additionally, the project requires compliance with regulations and permits, which may add to the overall cost. A rough estimate for the budget could be in the range of $5 million to $15 million, considering the cost of materials, labor, and equipment, as well as the complexity of the project and the need for regulatory compliance. However, this is a rough estimate and the actual budget could be higher or lower, depending on various factors such as the contractor's experience, the location, and the specific requirements of the project.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Eastern Municipal Water District·California

Top match · 60%

Lindenberger Road Pipeline Replacement

Closes 11/17/2026Opened 10/20/2026

Power Authority of New York·New York

60% match

Natural Gas Transportation- Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

Tarrant Regional Water District·Texas

58% match

Cedar Creek Section 2 Phase 2 Pipeline Replacement

Closes 12/10/2026Opened 10/29/2026

City of Daytona Beach·Florida

58% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

Public Water Supply District No. 2 of St. Charles County·Missouri

58% match

Western Transmission Main Phase 4C

Closes 11/19/2026Opened 10/9/2026

West County Wastewater·California

58% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Riverside·California

57% match

PARK AVENUE WATER TRANSMISSION MAIN REPLACEMENT

Closes 12/3/2026Opened 10/30/2026

U.S. Department Of Energy·Illinois

57% match

PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

Closes 11/19/2026Opened 10/8/2026

City of Columbus Ohio·Ohio

56% match

Parsons Avenue Water Plant – Wellfield Development – CW112 Raw Water Line

Closes 11/4/2026Opened 10/6/2026

Oregon Tualatin Valley Water District·Oregon

56% match

TVWD ITB 2027-004 176th & Sugar Plum Water Main Replacement

Closes 11/19/2026Opened 10/28/2026

City of Rancho Palos Verdes·California

56% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

LA Water & Power·California

56% match

137000 GROUT, MASTER FLOW

Closes 11/19/2026Opened 10/27/2026

Power Authority of New York·New York

56% match

Spot Natural Gas Supply - Richard M. Flynn Power Plant

Closes 12/31/2026Opened 3/27/2024

City of Key West·Florida

56% match

CDBG-MIT – Trenchless Installation of Utilities Across Fleming Channel

Closes 12/2/2026Opened 10/15/2026

City of Columbus·Ohio

56% match

PAWP Wellfield Development

Closes 11/4/2026Opened 10/5/2026

U.S. Department Of Defense·California

56% match

17--HOSE,MANIFOLD TO CY

Closes 11/8/2026Opened 10/28/2026

The City of Columbus·Ohio

56% match

RFQ033812 - PAWP Wellfield Development

Closes 11/4/2026Opened 10/7/2026

City of Des Moines - Iowa·Iowa

56% match

WRA Joint Trunk – Phase 14, Segment 3

Closes 12/1/2026Opened 10/21/2026

Butler County·Ohio

56% match

Symmes Road 42 – Inch Transmission Main Rehabilitation

Closes 11/20/2026Opened 10/21/2026

Washington Metropolitan Area Transit Authority (WMATA)·District of Columbia

56% match

FRSMP277009/JLM-Lighting Phase 2

Closes 12/2/2026Opened 10/23/2026

City of Redlands·California

56% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

Village of Cary·Illinois

56% match

RFQ-P Well No. 4 and WTP Phase II and III Engineering Services 11.20.26

Closes 11/6/2026Opened 10/20/2026

City of Austin·Texas

56% match

West Congress (Radam/St. Elmo) Water & WW Pipeline Renewal

Rolling / TBD closeOpened 7/13/2026

U.S. Department Of Defense·United States of America

56% match

47--MANIFOLD,HYDRAULIC

Closes 11/1/2026Opened 10/20/2026

Clermont County - Board of Commissioners·Ohio

56% match

Branch Hill Guinea Road Water Main Replacement (Branch Hill Miamiville Road to Loveland Miamiville Road)

Closes 11/19/2026Opened 10/21/2026