The project involves repairing Building 37 on Jefferson Barracks ANGS to ensure its primary and backup electrical systems function correctly in the event of a power outage. The repair work includes removing wiring from an outdoor transfer switch and restoring the power feed to the building from the transformer. The contractor will need to verify the existing service feeders, conductor material, and total pull length, among other things. The project has a planned performance period of 60 calendar days after notice to proceed.
Key aspects of the project include:
• Repairing the electrical systems in Building 37
• Removing wiring from the outdoor transfer switch
• Restoring the power feed to the building from the transformer
• Verifying existing service feeders and conductor material
• Determining the total pull length of conductors
• Coordinating with Ameren for utility outage permits
• Providing a one-year warranty on materials and workmanship
Attached files
Contact
Joe Bernier(Contracting Officer or Point of Contact)
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.