Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Michigan guideMichigan Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Michigan
  4. ›Construction
  5. ›Installation of Ceramic Floor Tile in WPC ECU Laboratory

City of Flint·Michigan

Installation of Ceramic Floor Tile in WPC ECU Laboratory

Rolling / TBD close$10k – $30kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Flint is seeking a contractor to install new ceramic floor tile in the WPC ECU Laboratory. The work involves removal of existing flooring, preparation of sub‑floor, and installation of ceramic tile according to specifications, including grout work and finishing. This is a straightforward construction‑type bid focused on interior finish work. • Scope: Remove existing floor, prep sub‑floor, install ceramic tile and grout. • Location: WPC ECU Laboratory, City of Flint facilities. • Materials: Provide and install all required ceramic tiles, adhesive, grout, and related supplies. • Requirements: Must comply with city specifications for durability and safety; contractor must be properly licensed for building construction in Michigan. • Timeline: Not stated; contractor to coordinate with city for scheduling.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
7/20/2022
Closes
Rolling / TBD

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
238190
Solicitation №
B18-029

Budget estimate

$10,000 – $30,000

Based on typical costs for ceramic tile installation in a moderate‑size laboratory space (approximately 1,000–2,000 sq ft), material costs range from $5–$10 per square foot and labor from $4–$8 per square foot. Assuming an average of 1,500 sq ft, total project cost would likely fall between $13,500 and $27,000. Therefore the contractor’s earnings (profit plus overhead) could be estimated in the low‑$10 k to low‑$30 k range. The estimate assumes standard tile quality, no specialty sub‑floor work, and normal market labor rates in Michigan.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Fox Valley Technical College·Wisconsin

Top match · 64%

Flooring Replacement – AG137 - REBID

Closes 11/13/2026Opened 10/30/2026

Lewis-Clark State College·Idaho

64% match

LC270002 – P1FCU Activity Center – Basement Flooring Replacement

Closes 11/5/2026Opened 10/10/2026

Massachusetts City of Lawrence·Massachusetts

64% match

Cementitious-Urethane (Epoxy) Flooring

Closes 11/5/2026Opened 10/21/2026

Lewis County Schools·West Virginia

63% match

Lewis County Schools Flooring Bid Package (On-Call Flooring Repair, Replacement, Removal & Installation)

Closes 11/4/2026Opened 10/21/2026

Corrections and Community Supervision, NYS Dept. of·New York

63% match

Repair Cooler Floor

Closes 11/5/2026Opened 10/15/2026

Southeast Kansas Education Service Center·Kansas

63% match

ESC-SPORTSFLOORING2027

Closes 11/4/2026Opened 9/28/2026

City of Lawrence·Massachusetts

62% match

Cementitious-Urethane (Epoxy) Flooring Installation

Closes 11/5/2026Opened 10/20/2026

Dillwyn Correctional Center·Virginia

62% match

Resinous Industrial Floor Coating Furnish and Install

Closes 11/23/2026Opened 10/21/2026

Grossmont Union High School District·California

62% match

CN-5012 Unit Price Flooring

Closes 11/18/2026Opened 10/30/2026

Darlington County·South Carolina

62% match

Laminate Flooring

Closes 11/26/2026Opened 10/13/2026

UCLA Capital Programs·California

61% match

RRUMC 4th Floor Patient Care Reconfiguration (BP 12 - Tile & Associated Waterproofing)

Rolling / TBD closeOpened 10/23/2026

Brazos Valley·Texas

61% match

Lincoln Center Gym Floor Removal and Installation

Closes 11/13/2026Opened 10/26/2026

Town of Westwood·Massachusetts

61% match

On Call Flooring

Rolling / TBD closeOpened 3/24/2026

University of South Carolina·South Carolina

61% match

Repair and Refinish Gym Floors

Closes 12/2/2026Opened 10/28/2026

University of Southern Mississippi·Mississippi

61% match

Joseph Anderson Cook Memorial Library Third‑Floor Carpeting

Closes 11/17/2026Opened 10/14/2026

U.S. Department Of Energy·California

61% match

Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project

Closes 11/11/2026Opened 10/19/2026

Temecula Valley Unified School District·California

61% match

Bid No. 2026-27-102 KITCHEN FLOORING AT VARIOUS SITES

Closes 11/9/2026Opened 10/19/2026

Williamsburg County School District·South Carolina

61% match

Notice Of Intent To Sole Source

Rolling / TBD closeOpened 10/26/2026

Texas Health & Human Services Commission·Texas

60% match

Rio Grande State Center needing removal and installation of flooring in Unit 1, Building 515

Closes 11/5/2026Opened 10/15/2026

Massachusetts Watertown Housing Authority·Massachusetts

60% match

FISH 321113

Closes 11/12/2026Opened 10/20/2026

Washtenaw Community College·Michigan

60% match

Bid - SC Welcome Center Flooring Replacement

Closes 11/16/2026Opened 10/26/2026

Oregon Department of Corrections·Oregon

60% match

Two Rivers Correctional Institution Kitchen Floor Replacement

Closes 11/10/2026Opened 8/19/2026

Iowa Department of Transportation·Iowa

60% match

Installation of new 240'x12" tile at US-30 (MM160.37 & STA 2234+90) in Story County

Closes 11/12/2026Opened 10/22/2026

Illinois DHS - Human Services·Illinois

60% match

DHS IFB CMHC Unit F Flooring Tile Abatement & Refinishing

Closes 11/6/2026Opened 10/14/2026

University of Wisconsin Madison·Wisconsin

60% match

Titanium Stirred 2-Reactor System with Controls for 4 Reactors

Closes 11/3/2026Opened 10/22/2026