The project involves the construction of a traditional breakpoint nutrient reduction wetland. The work includes selective clearing, excavation, grading, steel sheet pile installation, tile installation, water control structure, and seeding. The project requires approximately 12,950 cubic yards of earthwork, 932 square feet of steel sheet pile, 2,500 linear feet of tile installation, and 26.3 acres of seeding. The estimated construction cost range for this project is $450,000 to $550,000. The project is expected to be completed by June 15, 2027, with seeding to be done by June 30, 2027, and September 15, 2027.
• The project requires the installation of a steel sheet pile weir and a water control structure.
• The project involves the excavation and filling of approximately 12,950 cubic yards of earthwork.
• The project requires the installation of 2,500 linear feet of tile and 59 linear feet of drawdown pipe.
• The project involves the seeding of approximately 26.3 acres of land.
• The project requires the placement of 532 tons of riprap and 106 cubic yards of concrete grout.
You found this one too late. Don't find the next one too late.
Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.