Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Federal
  4. ›Notice of Intent to Sole Source - Reduced Gravity…

National Aeronautics And Space Administration·California

Notice of Intent to Sole Source - Reduced Gravity Modification of 737-73W Aircraft

Closes 4/13/2026$500k – $2MSole Source
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The National Aeronautics and Space Administration (NASA) / Armstrong Flight Research Center (AFRC) intends to award a sole-source contract for the modification of a Boeing 737-73W aircraft to enable reduced gravity flight operations. The scope of the project includes a feasibility assessment, modification of the aircraft cabin, painting the aircraft exterior, performing overdue scheduled maintenance tasks, and providing disposition for full-life of all permanent modifications made during the previous program. Interested organizations may submit their capabilities and qualifications to perform the effort electronically via email. The key tasks and deliverables of this project are: • Feasibility assessment to determine the Boeing 737-73W’s suitability to perform reduced gravity missions • Modify the aircraft cabin to support reduced gravity operations • Paint the aircraft exterior to include NASA identifiers • Perform all overdue scheduled maintenance tasks • Provide disposition for full-life of all permanent modifications made during previous program

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jenni Schnarr

[email protected]

Key dates

Opened
4/8/2026
Closes
4/13/2026

Last updated

Details

Type
Sole Source
Industry
Aerospace and Defense
NAICS
336414
Solicitation №
80AFRC26SS014

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of the work, which includes a feasibility assessment, modification of the aircraft cabin, painting the aircraft exterior, and performing overdue scheduled maintenance tasks. The cost of these tasks can vary widely depending on the complexity of the modifications and the extent of the maintenance required. However, as a rough estimate, the total budget could be in the range of $500,000 to $2 million, considering the cost of labor, materials, and equipment required for the project. The factors that may influence the likely payment range include the extent of the modifications, the cost of materials and equipment, and the labor costs.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Washington

Top match · 71%

P-8A Ground Vibration Testing

Closes 11/16/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

70% match

62--LIGHT,LANDING,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/15/2026Opened 10/14/2026

U.S. Department Of Defense·California

69% match

NOTICE OF INTENT TO SOLE SOURCE

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

68% match

16--NRP,USSR,AIRCRAFT,M, IN REPAIR/MODIFICATION OF

Closes 11/19/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

68% match

59--SSE,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF

Closes 11/26/2026Opened 8/13/2026

Department of Administration·South Carolina

68% match

Notice Of Intent To Sole Source

Rolling / TBD closeOpened 8/20/2026

U.S. Department Of Defense·United States of America

67% match

FIXTURE,AIRCRAFT MA

Closes 11/12/2026Opened 10/22/2026

U.S. Department Of Defense·Pennsylvania

67% match

62--LIGHT,TAXIING,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/18/2026

U.S. Department Of Defense·Oklahoma

67% match

1560016066809 / STIFFENER,AIRCRAFT / AIRCRAFT, STRATOLIFTER C/KC-135

Closes 10/29/2029Opened 10/23/2026

U.S. Department Of Defense·Pennsylvania

67% match

59--SSE,AIRCRAFT,MATERI, IN REPAIR/MODIFICATION OF

Closes 11/27/2026Opened 8/13/2026

U.S. Department Of Defense·United States of America

67% match

16--WHEEL HALF,AIRCRAFT, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

67% match

AIRCRAFT COMPONENTS

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·California

67% match

15--SPOILER,WING,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026

U.S. Department Of Defense·United States of America

67% match

16--AUX RACK MAINFRAME

Closes 11/23/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

67% match

36--GENERATOR,AIRCRAFT,, IN REPAIR/MODIFICATION OF

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

66% match

Sources Sought: F-16 Transparencies

Closes 2/16/2027Opened 10/21/2026

U.S. Department Of Defense·Virginia

66% match

VOYAGE CHARTER

Closes 11/4/2026Opened 10/27/2025

U.S. Department Of Defense·United States of America

66% match

62--LIGHT,TAXIING,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/1/2026Opened 9/18/2026

U.S. Department Of Defense·United States of America

66% match

16--PAM,AIRCRAFT,MATERI

Closes 11/26/2026Opened 10/22/2026

U.S. Department Of Defense·Ohio

66% match

62--LIGHT,TAXIING,AIRCR, IN REPAIR/MODIFICATION OF

Closes 11/9/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

66% match

70--TRANSFER UNIT,PROGR, IN REPAIR/MODIFICATION OF

Closes 11/11/2026Opened 9/26/2026

U.S. Department Of Defense·United States of America

66% match

16--NRP,SPOILER ASSY -, IN REPAIR/MODIFICATION OF

Closes 11/8/2026Opened 9/22/2026

U.S. Department Of Defense·United States of America

66% match

16--WHEEL HALF,AIRCRAFT, IN REPAIR/MODIFICATION OF

Closes 11/22/2026Opened 10/8/2026

U.S. Department Of Defense·United States of America

66% match

16--REGULATOR,AIR PRESS, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/9/2026

U.S. Department Of Defense·California

66% match

15--SPOILER,WING,AIRCRA, IN REPAIR/MODIFICATION OF

Closes 11/23/2026Opened 10/23/2026