Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Tennessee guideTennessee Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Tennessee
  4. ›Civil Engineering
  5. ›Cured in Place Pipe Installation

Tennessee

Cured in Place Pipe Installation

Closes 8/10/2026Login required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

Click the “Link to bid” button below for more information.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Key dates

Opened
7/24/2026
Closes
8/10/2026

Last updated

Details

Industry
Civil Engineering
NAICS
237110

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Buy Board Purchasing Cooperative·Texas

Top match · 76%

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Thermo Cured Products)

Closes 11/12/2026Opened 9/4/2026

Buy Board Purchasing Cooperative·Texas

73% match

Cured in Place Pipe (CIPP) for Pipeline Rehabilitation (Ultraviolet-Light Cured Products)

Closes 11/12/2026Opened 9/4/2026

City of Marysville, Ohio·Ohio

70% match

2027 Sanitary Sewer Cured‑in‑Place Pipe (CIPP) Lining Project

Closes 11/20/2026Opened 10/30/2026

Georgia City of Sandy Springs·Georgia

68% match

27-014 Trenchless Stormwater Pipe Rehabilitation Project - 2027

Closes 11/19/2026Opened 10/19/2026

City of Bellevue·Washington

68% match

Sewer Pipe Defect Repair 2025

Closes 11/5/2026Opened 10/15/2026

California Department of Transportation·California

67% match

Reinforced concrete pipe trenchless installation method.

Closes 11/10/2026Opened 10/5/2026

City of Charlotte·North Carolina

66% match

Pipe Patching Services

Rolling / TBD closeOpened 6/29/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

66% match

CONSUMABLES PIPE WRAP THREAD SEALANT MATERIAL DROP PIPE REPAIR

Closes 11/9/2026Opened 10/28/2026

City of Chula Vista·California

66% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

City of Redlands·California

66% match

2026 CIP Water Pipeline Replacement Project

Closes 11/16/2026Opened 10/29/2026

City of West Des Moines·Iowa

65% match

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

Gary Sanitary District·Indiana

64% match

Request For Quotes Sanitary Sewer Lining at 8535 Lakewood Avenue

Closes 11/5/2026Opened 10/21/2026

Greenwood Metropolitan District·South Carolina

64% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

City of Appleton, WI·Wisconsin

64% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

City of Albany·Georgia

64% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

Connecticut UConn Health Center·Connecticut

63% match

Prequalification: E Building Heat Pipe Replacement

Closes 11/17/2026Opened 10/27/2026

West County Wastewater·California

63% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

Pennsylvania Department of Transportation·Pennsylvania

63% match

SR117 Thermoform PVC Pipe Lining

Closes 11/3/2026Opened 10/15/2026

City of San Bernardino·California

63% match

CONNECTOR PIPE SCREEN (CPS) PHASE 4 PROJECT NO. 13683 CONTRACT NO. SD 26-003

Closes 11/23/2026Opened 10/26/2026

U.S. Department Of Defense·New Hampshire

63% match

Float Well Pipe Repairs, Surry Mountain Dam, Surry, NH

Closes 11/23/2026Opened 10/21/2026

City of Shawnee·Kansas

63% match

2027 Annual Stormwater Pipe Repair Project

Closes 11/12/2026Opened 10/22/2026

City of Daytona Beach·Florida

63% match

2701TB - Tomoka Farms Road & Bellevue Avenue Watermain Realignment Project

Closes 11/5/2026Opened 10/1/2026

Town of Manchester·Connecticut

63% match

FURNISH AND INSTALL INSERTS FOR SIPHONS 1 & 3 AT GLOBE HOLLOW WATER TREATMENT FACILITY

Closes 11/17/2026Opened 10/20/2026

Virginia Polytechnic Institute and State University·Virginia

62% match

Whitehurst Hall Piping Replacement

Closes 11/13/2026Opened 10/26/2026

Palm Beach County – Facilities Development & Operations·Florida

62% match

PIPE & FITTINGS, DUCTILE IRON, PURCHASE OF, PRE-QUAL, CTYWD

Closes 5/4/2031Opened 7/1/2026