Midland Independent School District is soliciting competitive sealed proposals for the renovation of two junior high schools—San Jacinto and Abell—under Bond 2023 Package 9, Group C. The scope includes demolition of existing interior finishes, replacement of roofing, exterior brick repair, upgrades to toilet partitions, installation of new kitchen and food‑service equipment, new walk‑in coolers/freezers, flooring upgrades, and the addition of covered walk‑away canopies. The bid package contains a detailed set of specifications, alternates (e.g., pavement replacement, canopy construction, kitchen equipment upgrades), and allowances totaling roughly $845 K for each school. The project will be executed by a general contractor who must coordinate all trades, adhere to local, state, and national codes, and manage the listed alternates and allowances.
• Competitive sealed proposal (Invitation for Bid) with a closing date of 9 Sept 2026.
• Pre‑proposal meetings on 22 July 2026 at each school site.
• Question cutoff 28 Aug 2026; answers posted by 31 Aug 2026.
• Major work includes demolition, structural repairs, roofing, interior finishes, MEP upgrades, and site‑specific alternates.
• Allowances for design & construction ($382.5 K + $232.5 K) and for exterior brick, landscaping, etc.
• Substitutions for walkway coverings and other items must be approved via formal request forms.