This contract awards the City of Yakima a comprehensive streetscape and utility‑upgrade project along North 1st Street from the ‘N’ Street intersection to State Route 12. The scope encompasses demolition, earthwork, pavement reconstruction, storm‑sewer and water‑main installation, associated utility fittings, and a full streetscape package that includes landscaping, lighting, benches, bike racks, and traffic‑control devices. The award was made to TAPANI Inc. for a total contract value of approximately $3.45 million, based on a competitive, fixed‑price bid.
• Primary work categories: roadway excavation, base and surface paving, PVC storm‑sewer pipe, ductile‑iron water‑main pipe, manholes, valves, and back‑flow devices.
• Supplemental streetscape items: trees, mulch, topsoil, concrete curbs, benches, trash receptacles, bike racks, lighting fixtures, and traffic‑signage.
• Funding: Federal aid (STPUS‑4579) combined with municipal funds; 5 % bid‑bond requirement; schedule‑A and schedule‑B cost totals clearly itemized.