Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Florida guideFlorida Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Florida
  4. ›Construction
  5. ›ROAD RECONSTRUCTION OF THREE LOCATIONS (MALABAR AT JUPITER…

Awarded contract·City of Palm Bay·Florida

ROAD RECONSTRUCTION OF THREE LOCATIONS (MALABAR AT JUPITER INTERSECTION, SAN FILIPPO AT WACO INTERSECTION AND COMMUNITY COLLEGE PARKWAY)

Won by Asphalt Paving Systems, Inc.$711kSingle Award
Contract source

Awarded vendors

  • Asphalt Paving Systems, Inc.

Description

The City of Palm Bay, Florida, issued a Request for Proposal (RFP) for the road reconstruction of three locations: Malabar at Jupiter intersection, San Filippo at Waco intersection, and Community College Parkway. The project involves full depth reclamation, drainage work, and paving. The contractor is responsible for furnishing and installing all parts of the project as shown on the project plans and bid quantities. The contract was awarded to Asphalt Paving Systems, Inc. for a total price of $711,145.00. • The project includes three locations: Malabar at Jupiter intersection, San Filippo at Waco intersection, and Community College Parkway. • The contractor is responsible for full depth reclamation, drainage work, and paving. • The contract was awarded for a total price of $711,145.00. • The contractor must furnish and install all parts of the project as shown on the project plans and bid quantities. • The project requires the contractor to perform various tasks, including surveying, dewatering, temporary striping, temporary business signs, temporary signs, utility coordination, signal adjustment coordination, relocation as required with utility companies, disposal of materials, and relocation or installation of materials within the project limits.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
43-0-2016

Contract value

$711,145

The contract value is explicitly stated as $711,145.00, which is the total price for the road reconstruction project at three locations in Palm Bay, Florida. This value is based on the contractor's proposal and the city's acceptance of the bid.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Fort Wayne·Indiana

Top match · 70%

0914S - West Coliseum Blvd Reconstruction

Closes 11/12/2026Opened 10/29/2026

City of The Colony·Texas

67% match

Phase 15A Street Reconstruction

Closes 12/3/2026Opened 10/16/2026

City of Morgan Hill·California

66% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

City of Toledo·Ohio

66% match

Douglas Road Roadway Reconstruction

Closes 11/24/2026Opened 10/30/2026

City of San Antonio·Texas

66% match

23-03922 Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of Hampton·Virginia

66% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Charlotte·North Carolina

66% match

Albemarle Road Pedestrian Safety and Connectivity

Rolling / TBD closeOpened 7/1/2027

Massachusetts Department of Transportation·Massachusetts

66% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 11/10/2026Opened 9/14/2026

County of Santa Cruz·California

66% match

Eureka Canyon Road PM 8.11 and 8.39 Storm Damage Repair Projects

Closes 11/5/2026Opened 10/8/2026

City of Doge City·Kansas

66% match

Trail St & Overpass CCLIP (closed 10/20)

Rolling / TBD closeOpened 9/15/2026

City of Waco·Texas

66% match

Pavement Rehabilitation, District 1

Closes 12/8/2026Opened 10/27/2026

Idaho Transportation Department·Idaho

66% match

Key No. 24250 1ST STREET WIDENING, AMMON

Closes 11/10/2026Opened 10/16/2026

Clear Creek ISD·Texas

66% match

Brookside, League City, Space Center Intermediate School Renovations

Closes 11/3/2026Opened 10/6/2026

City of Morgan Hill·California

65% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/23/2026

California Department of Transportation·California

65% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

City of Vernon·California

65% match

Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements -- Indiana Street to Sunol Drive

Closes 11/17/2026Opened 10/19/2026

City of Toledo·Ohio

65% match

Telegraph Road & Alexis Road Resurfacing & Multi-Use Path, LUC-US24-28.3, PID 117877

Closes 11/17/2026Opened 10/23/2026

Jackson County Board of County Commissioners·Florida

65% match

2627-07 - Seminole Drive Reconstruction

Closes 11/19/2026Opened 10/15/2026

Texas City of San Antonio·Texas

65% match

Toepperwein Rd (Nacogdoches to Wenzel Rd) - 2022 Bond

Closes 12/1/2026Opened 10/28/2026

City of Lowell·Massachusetts

65% match

Appleton Church Streets Project

Closes 11/24/2026Opened 10/28/2026

Bluewing Civil Consultants, LLC.·Louisiana

65% match

West Interstate Dr. and Walmart Dr. Roadway Improvements – Project No. 226011

Closes 11/9/2026Opened 10/14/2026

City of Fort Wayne·Indiana

65% match

0890C - Eckart St Reconstruction: S Anthony Blvd to Winter St

Closes 11/12/2026Opened 10/29/2026

U.S. Department Of Transportation·Colorado

65% match

CO BR UCPO Blue Mesa Road(1) Blue Mesa Road

Closes 12/1/2026Opened 10/27/2026

City of Lancaster·Texas

65% match

2026 Roadway Reconstruction Projects

Closes 12/16/2026Opened 10/7/2026

West County Wastewater·California

65% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026