The contract is for the preparation of a new unit, MT134316, which includes fabricating and installing various components such as a rack over the truck cab, a toolbox, and a cone holder and water cooler holder. The contract was awarded to Cardinal Truck Body for a total amount of $7,130.00. The scope of work includes furnishing and installing the required components, and the contract is expected to be completed within 30 days. Key points to consider are:
• The contract is for a specific vehicle, MT134316, and includes custom fabrication and installation of various components.
• The contract was awarded to Cardinal Truck Body, a company based in Clearwater, FL.
• The total contract amount is $7,130.00.
• The contract is expected to be completed within 30 days.
• The points of contact for the contract are N. Thomas Bayot and Neil Sapp.