The contract is for the replacement of a bridge in Miami County, Kansas. The project is identified as 13-02-SB (622) D-1.1. The bid was posted on December 19, 2017, and the bid submission date was January 9, 2018. The contract was awarded to one of the several contractors who submitted bids, but the exact award amount is not specified. The scope of work includes the replacement of the bridge, and the engineer's estimate for the project is not provided.
• The bid results show that several contractors submitted bids, including Redford Construction, Bryen-ohlmeier Construction, Mies Construction, Reece Construction Co., Shorten Construction Co., and WCI, Inc.
• The bid bond requirement is yes or no, and the addendum 1 total base bid and alternate bid item are listed for each contractor.
• The contract is for a specific project, and the procurement process was conducted by Miami County, Kansas.