The University of North Florida is seeking bids from pre-qualified general contractors to repair the bulkhead at Candy Cane Lake. The awarded contractor will be responsible for removing/disposing of the existing bulkhead and components, and providing the labor, equipment, and material to install a new bulkhead in accordance with the drawings and specifications. The contract will be awarded to the lowest responsible and responsive bidder whose bid meets the requirements and/or criteria set forth in the ITB. Some key points about this contract include:
• The contract is for the repair of the bulkhead at Candy Cane Lake.
• The contract was awarded to Lasa Construction Inc for $97,400.00.
• The substantial completion is stated as 90 calendar days and the final completion is stated as 30 calendar days after substantial completion.
• The University requires a Builders Risk policy and a 100% Performance & Payment Bond for the winning bid(s) if over $100,000.
• Liquidated Damages: $250/day.