Description
This contract covers the annual replacement and reconstruction of concrete sidewalks, curb, and gutter infrastructure within Madison’s District 2 and District 6. The work includes demolition of existing concrete, installation of new 5‑in. and 7‑in. concrete sidewalks, MOD A curb‑and‑gutter construction, ADA‑compliant ramps and detectable warning fields, bus‑stop pad construction, timber retaining walls, utility coordination, and site erosion control. The prime contractor, LaLonde Contractors, Inc., is responsible for delivering all labor, materials, and equipment under a unit‑price schedule, meeting a 7 % Small Business Enterprise goal, and adhering to strict traffic‑control, tree‑protection, and safety requirements. The project is funded by the City of Madison’s capital budget and must be completed by the contractual deadline of 30 Oct 2026.
• Scope: concrete sidewalk replacement, curb‑gutter work, bus‑pad and ADA ramp construction, utility verification, erosion control.
• Value: $1.22 M total contract, with $86.5 K subcontracted to a trucking firm.
• Schedule: work begins after a start‑work letter (on or before 8 Jun 2026) and must finish by 30 Oct 2026.