Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Massachusetts guideMassachusetts Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Massachusetts
  4. ›Construction
  5. ›Sewer Rehab - Various Streets (S23-3)/DPWP

Awarded contract·City of Worcester·Massachusetts

Sewer Rehab - Various Streets (S23-3)/DPWP

Won by Borges Construction$6.6MSingle Award
Contract source

Awarded vendors

  • Borges Construction

Description

This City of Worcester ARPA‑funded contract covers the complete reconstruction and rehabilitation of sanitary and surface sewer lines, along with water‑main replacement, across multiple streets (including Paine, Gilman, Vinton, and others). The scope includes extensive earthwork, trench pipe installation (ductile‑iron, PVC, and reinforced concrete), manhole and catch‑basin fabrication, dewatering, excavation support, concrete works, tracer‑tape installation, and associated testing (CCTV, vacuum, low‑pressure air). The contractor must provide performance and labor‑materials bonds equal to the contract sum, maintain a 5 % bid security, comply with Buy‑American and Davis‑Bacon requirements, and adhere to strict safety, noise, and environmental controls. The contract duration is limited to 270 calendar days from award, with progress payments tied to schedule approvals and certifications.

Attached files

Key dates

Bids closed
6/14/2023
Contract modified
6/13/2023
Duration
270 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237110
Solicitation №
7981-M3

Contract value

$6,600,000

The solicitation’s “Estimated cost” was listed as $4,000,000, but addenda increased quantities (e.g., rock disposal from 177 CY to 940 CY, and added 24 green traps). The mobilization lump‑sum is capped at $330,000, which the documents state is ≤ 5 % of the total bid. Solving 0.05 × Total ≈ $330,000 yields a total contract value of roughly $6.6 million. This estimate also aligns with the typical scale of a multi‑street sewer rehab in a medium‑size city, where unit prices for pipe, manholes, and earthwork alone can easily exceed $5 million. Therefore a reasonable ballpark for the contract is between $6 million and $7 million, with $6.6 million as a midpoint estimate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of West Des Moines·Iowa

Top match · 72%

2026 Sewer Pipe Rehabilitation Program

Closes 11/4/2026Opened 10/20/2026

City of South San Francisco·California

72% match

2027 Sanitary Sewer Spot Repair and Rehabilitation Project

Closes 11/13/2026Opened 10/21/2026

West County Wastewater·California

71% match

San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation

Closes 11/13/2026Opened 10/30/2026

City of Douglas·Wyoming

71% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

City of Fargo·North Dakota

71% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

Town of Honea Path·South Carolina

71% match

Chiquola and Clatworthy Subbasin Sewer Rehab Phase 3 (Division C)

Closes 11/24/2026Opened 10/23/2026

Greenwood Metropolitan District·South Carolina

70% match

Curltail Creek Sewer Rehabilitation

Closes 11/19/2026Opened 10/20/2026

Louisiana Jefferson Parish Purchasing Department·Louisiana

70% match

Sewer Lift Station Rehabilitation (D 6-6) 6801 Veteran s Memorial Blvd

Closes 12/8/2026Opened 10/21/2026

City of Chula Vista·California

70% match

SEWER PIPELINE REHABILITATION FY 21/22

Closes 11/12/2026Opened 10/23/2026

U.S. Department Of Defense·Missouri

69% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

City of Douglas·Wyoming

69% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

City of Philadelphia·Pennsylvania

69% match

PW Bid 2917 - SEWER RECONSTRUCTION and RELAY of WATER MAINS in BROOKLYN ST from ASPEN ST

Closes 11/5/2026Opened 10/14/2026

City of Seattle·Washington

69% match

Spot Sewer Rehabilitation Unit Price Contract 6

Closes 11/4/2026Opened 10/7/2026

City of Ponca·Oklahoma

69% match

Ponca City Sanitary Sewer Bois D Arc' Phase III

Closes 1/30/2027Opened 1/14/2025

City of Albany·Georgia

69% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

City of Philadelphia·Pennsylvania

69% match

PW Bid 2521-SEWER RECONSTRUCTION and RELAY of WATER MAINS in MANTON ST FROM S. 8TH ST to S. 7TH ST

Closes 11/10/2026Opened 10/28/2026

City of Rancho Palos Verdes·California

69% match

STORM DRAIN REPAIRS ON PALOS VERDES DRIVE WEST (PVDW) & SOUTH (PVDS)

Closes 11/13/2026Opened 10/19/2026

Maryland Baltimore County Government·Maryland

68% match

23001 SX0 Long Quarter Interceptor Rehabilitation

Closes 11/12/2026Opened 9/19/2026

Connecticut Town of Fairfield·Connecticut

68% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

Portage County·Ohio

68% match

Mantua Sanitary Sewer Rehab-Bid

Rolling / TBD closeOpened 10/7/2026

City of Whitehall·Ohio

68% match

Beechbank and Broadhurst Sewer Rehabilitation

Closes 11/13/2026Opened 10/28/2026

City of Appleton, WI·Wisconsin

68% match

N-26 Sewer spot repairs, protruding tap and mineral deposit removal

Closes 11/2/2026Opened 10/20/2026

City of Philadelphia·Pennsylvania

68% match

PW Bid 2797-SEWER RECONSTRUCTION and RELAY of WATER MAINS in PECHIN ST from DUPONT ST to LEVER

Closes 11/10/2026Opened 10/23/2026

City of Fresno·California

68% match

Sewer Rehabilitation in Clinton, Fruit, McKinley, and West Avenues

Closes 11/3/2026Opened 9/29/2026

Gary Sanitary District·Indiana

68% match

REQUEST FOR QUOTES SANITARY SEWER REPAIR AT 1608 Broadway

Closes 11/19/2026Opened 10/29/2026