The contract is for the construction of FY 21 Local Streets Package 6, which includes the removal and replacement of curbs, ramps, and sidewalks, as well as the milling and overlay of 3" on local streets. The contract also includes associated striping and utility adjustments. The contract price is $4,105,210.00, and the contract duration is 90 consecutive calendar days. The contractor is required to provide a performance bond and a payment bond, each in the amount of 100% of the contract price. The contract also includes a warranty period of 24 months. Some key features of the contract include:
* The contract is for a construction project in Tucson, Arizona
* The project includes removal and replacement of curbs, ramps, and sidewalks
* The project includes milling and overlay of 3" on local streets
* The contract price is $4,105,210.00
* The contract duration is 90 consecutive calendar days
* The contractor is required to provide a performance bond and a payment bond
* The contract includes a warranty period of 24 months