Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Maryland guideMaryland Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Maryland
  4. ›Civil Engineering
  5. ›Sewer Interceptor Cleaning

Awarded contract·Frederick County Procurement & Contracting Department·Maryland

Sewer Interceptor Cleaning

Won by American Pipeline Solutions, Inc.$500kSingle Award
Contract source

Awarded vendors

  • American Pipeline Solutions, Inc.

Description

The Frederick County Division of Water and Sewer Utilities is seeking proposals to provide poly pig pipe cleaning procedures to safely and effectively clean and restore to maximum flow capacity, low-pressure sewer piping systems. The contractor will be responsible for providing all supervision, labor, tools, transportation, material, and equipment necessary to clean the low-pressure sewer pipelines using poly pigs and an approved poly pig procedure. The contract includes the installation of equipment, disassembly, and cleanup. • The contractor will utilize the county-provided poly pig launching and retrieval devices. • The contractor will furnish poly pig swabs and poly pigs. • No excavations should be required for normal pigging operations. • The county will be responsible for excavation, repairs, and restoration if a failure occurs on the subject line, which is not the fault of the contractor.

Attached files

Key dates

Last updated

Details

Award type
Single Award
Industry
Civil Engineering
NAICS
237110
Solicitation №
21-516

Contract value

$500,000

The contract value cannot be determined with certainty, as the provided documents do not include a clear statement of the contract amount. However, based on the scope of work, which involves the cleaning and restoration of low-pressure sewer piping systems, the contract value is likely to be in the range of hundreds of thousands to millions of dollars. This estimate is rough and based on the assumption that the contract will involve significant labor, equipment, and material costs.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

Prince William County Service Authority·Virginia

Top match · 72%

IFB SA 2707 General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping, and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

Maryland Baltimore County Government·Maryland

71% match

20196 SX0 Glen Echo Interceptor Relief Sewer

Closes 10/7/2027Opened 9/9/2025

U.S. Department Of Defense·Indiana

70% match

Section 219 Chesterton Interceptor Rehab

Closes 10/15/2027Opened 10/15/2026

Maryland Baltimore County Government·Maryland

70% match

23001 SX0 Long Quarter Interceptor Rehabilitation

Closes 11/12/2026Opened 9/19/2026

Prince William County Service Authority·Virginia

69% match

IFB SA 2707-General Sanitary Sewer Cleaning, CCTV, Flow Control-Bypass Pumping and Hydro-Excavation Work

Closes 11/24/2026Opened 10/20/2026

Connecticut Town of Fairfield·Connecticut

69% match

Phase 6 Sewer System Rehabilitation

Closes 11/4/2026Opened 10/14/2026

Town of Westwood·Massachusetts

68% match

Catch Basin Cleaning

Rolling / TBD closeOpened 9/9/2026

City of Douglas·Wyoming

68% match

Sanitary Sewer and Misc WWTP Improvements Project

Closes 11/3/2026Opened 10/16/2026

Town of Chase City·Virginia

68% match

Sanitary Sewer Rehabilitation

Closes 12/9/2026Opened 10/29/2026

City of Mansfield·Texas

68% match

Westside Sanitary Sewer Interceptor Project 1

Closes 11/18/2026Opened 10/21/2026

City of Raytown·Missouri

68% match

2026 Sanitary Sewer Maintenance Project: White Oak West

Closes 11/18/2026Opened 10/22/2026

Brazos Valley·Texas

68% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

City of Lynchburg·Virginia

67% match

IFB 2027-027 CSO 70 SEWER IMPROVEMENTS

Closes 12/8/2026Opened 10/21/2026

Metropolitan Council·Minnesota

67% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/10/2026Opened 9/24/2026

City of Dublin, OH - Engineering·Ohio

67% match

Deer Run Sanitary Sewer Infiltration & Inflow Mitigation Pilot Project

Closes 11/3/2026Opened 9/30/2026

City of Douglas·Wyoming

67% match

Sanitary Sewer and Misc. WWTP Improvements Project

Closes 11/3/2026Opened 10/7/2026

Village of Hoffman Estates·Illinois

67% match

2026 Storm Inlet Cleaning Project

Closes 11/12/2026Opened 10/29/2026

Brazos Valley·Texas

67% match

NW SEWER INTERCEPTOR (A) & STILL CREEK SEWER PLANT BANK STABILIZATION (B) & STILL CREEK WWTP PUMP REPLACEMENT (C)

Closes 11/3/2026Opened 10/6/2026

Georgia DeKalb County Government·Georgia

67% match

Annual Return Line Cleaning (Three (3) Year Multiyear Contract)

Closes 11/23/2026Opened 10/7/2026

Portage County·Ohio

66% match

2025 Sewer Maintenance Program (Franklin Hills P.S.)-Bid

Rolling / TBD closeOpened 4/22/2026

City of Pueblo·Colorado

66% match

2026 Large Main Cleaning

Closes 11/17/2026Opened 10/27/2026