This contract concerns a complete renovation of the men’s and women’s restroom/shower facilities at Fire Station #7 (Seelhorst) in Mobile, AL. The work includes full demolition of existing shower components, installation of a cultured‑marble wall‑and‑pan system with Schluter‑Kerdi waterproofing, new plumbing fixtures (mixing valves, shower heads, drains), replacement of ceiling systems with moisture‑resistant tiles, electrical updates (LED downlights, vanity lighting), HVAC diffuser and return replacement, painting, door and mirror installation, and thorough cleaning. A $5,000 contingency is built into the quote, and the project requires appropriate city permits, bonding, insurance, and compliance with DBE participation requirements.
• Demolition & reconstruction of two shower suites (men’s & women’s)
• Installation of cultured‑marble shower pan, waterproof membrane, and new plumbing fixtures
• Replacement of ceiling, lighting, HVAC diffuser, doors, mirrors, and finish work with moisture‑resistant materials
• Mandatory $10,000 surety bonds for permits, performance & labor bonds, and comprehensive insurance coverage