This solicitation (RFQ 5330‑20) from the City of Spokane Purchasing Department seeks a complete belt‑conveyor bearing and gearbox package for the Spokane Wastewater Treatment & Engineering Facility, including a gearbox equipped with a 5‑7/16″ shaft bushing. Four vendors submitted unit‑price quotes; the lowest total cost (including tax) was offered by WEMCO at roughly $53 k, while the highest was Norfolk Bearings at about $68 k. An addendum issued on September 15 2020 confirmed that the gearbox must include the specified bushing and required a signed copy from vendors. The contract is a single‑award, unit‑price procurement, awarded after the bid deadline of September 24 2020 and formally awarded on October 12 2020. The City’s standard terms and conditions (Washington State law, Spokane County venue) apply.
• Scope: Supply, deliver, and install belt‑conveyor gearbox, bushing, and associated spherical‑roller bearings.
• Procurement: Full and open competition, unit‑price pricing, no set‑aside indicated.
• Value: Estimated contract value between $50 k‑$70 k based on the submitted quotes.