Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • New Jersey guideNew Jersey Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›New Jersey
  4. ›Civil Engineering
  5. ›Contract No. P200.808 Shoulder Erosion Improvements…

Awarded contract·New Jersey Turnpike Authority (NJTA)·New Jersey

Contract No. P200.808 Shoulder Erosion Improvements, Milepost 154 to 156

$1.5MSingle Award
Contract source

Description

This solicitation concerns a highway‑maintenance contract for “Shoulder Erosion Improvements” on the New Jersey Turnpike between milepost 154 and milepost 156. The work is expected to address erosion of the road shoulder, likely involving removal of degraded material, installation of stabilization measures (e.g., rip‑rap, geotextiles, vegetation), and reconstruction of the shoulder surface to restore safety and drainage. • Scope: erosion control and shoulder reconstruction on a ~2‑mile stretch of the Turnpike. • Likely deliverables: site assessment, removal of compromised material, installation of erosion‑control structures, and resurfacing. • Project context: part of ongoing roadway preservation efforts to maintain structural integrity and safety of the Turnpike corridor.

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
8/21/2025

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237990
Solicitation №
Contract No. P200.808

Contract value

$1,500,000

The document provides no dollar amount. Typical shoulder‑erosion repair on a limited mileage (≈2 mi) can range widely based on site conditions, material, and design complexity. Assuming moderate erosion that requires removal of existing material, installation of rip‑rap or geotextile stabilization, and resurfacing, a rough industry benchmark is roughly $500 k–$1 M per mile for similar highway projects. Multiplying by the ~2‑mile scope gives an estimated contract value of $1 M to $2 M. Taking a midpoint for a conservative ballpark, the contract is likely valued around **$1.5 million**. Factors influencing the final price would include: soil conditions, accessibility, required permitting, material prices, and any ancillary utility work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

North Carolina Department of Transportation·North Carolina

Top match · 75%

54-TJK-02-PR40857, STATE ROUTE SHOULDER AND MEDIAN MOWING

Closes 11/18/2026Opened 10/28/2026

North Carolina Department of Transportation·North Carolina

74% match

54-TJK-02-PR40858, STATE ROUTE SHOULDER AND MEDIAN MOWING

Closes 11/18/2026Opened 10/28/2026

North Carolina Department of Transportation·North Carolina

74% match

54-TJK-02-PR40861, STATE ROUTE SHOULDER AND MEDIAN MOWING

Closes 11/18/2026Opened 10/28/2026

North Carolina Department of Transportation·North Carolina

73% match

54-TJK-07-PR40776, STATE ROUTE SHOULDER AND MEDIAN MOWING

Closes 11/18/2026Opened 10/21/2026

North Carolina Department of Transportation·North Carolina

73% match

54-TJK-11-PR39591, STATE ROUTE SHOULDER AND MEDIAN MOWING

Closes 11/18/2026Opened 10/21/2026

Illinois Tollway·Illinois

73% match

I-26-2064 - Asphalt Overlay & Pavement Marking

Closes 11/13/2026Opened 10/3/2026

North Carolina Department of Transportation·North Carolina

73% match

54-TJK-11-PR39598, STATE ROUTE SHOULDER AND MEDIAN MOWING

Closes 11/18/2026Opened 10/21/2026

Texas Department of Transportation·Texas

72% match

LOCAL LET MAINTENANCE CONTRACT, MEDINA CO, EROSION REPAIR

Closes 11/12/2026Opened 10/14/2026

Texas Department of Transportation·Texas

72% match

LOCAL LET MAINTENANCE CONTRACT, ATASCOSA CO, EROSION REPAIR

Closes 11/12/2026Opened 10/14/2026

U.S. Department Of Transportation·Idaho

72% match

ID FLAP CLEAR 4783(1), Dent Bridge Road Improvements

Closes 8/12/2028Opened 9/14/2026

Illinois Tollway·Illinois

72% match

I-26-2059 - Plaza Improvements

Closes 11/13/2026Opened 10/3/2026

North Carolina Department of Transportation·North Carolina

72% match

54-TJK-11-PR39595, STATE ROUTE SHOULDER AND MEDIAN MOWING

Closes 11/18/2026Opened 10/21/2026

North Carolina Department of Transportation·North Carolina

72% match

54-TJK-04-PR39720, STATE ROUTE SHOULDER AND MEDIAN MOWING INCLUDING VEGETATION TRIMMING AND LITTER/DEBRIS REMOVAL

Closes 11/18/2026Opened 10/28/2026

North Carolina Department of Transportation·North Carolina

72% match

54-TJK-04-PR39988, STATE ROUTE SHOULDER AND MEDIAN MOWING INCLUDING VEGETATION TRIMMING AND LITTER/DEBRIS REMOVAL

Closes 11/18/2026Opened 10/28/2026

Texas Department of Transportation·Texas

71% match

STATE LET CONSTRUCTION CONTRACT, HUNT CO, WIDEN ROAD - ADD SHOULDERS

Closes 11/4/2026Opened 10/7/2026

North Carolina Department of Transportation·North Carolina

71% match

54-TJK-06-PR40682, STATE ROUTE SHOULDER AND MEDIAN MOWING INCLUDING VEGETATION TRIMMING AND LITTER/DEBRIS

Closes 11/18/2026Opened 10/28/2026

Illinois THA - Toll Highway Authority·Illinois

71% match

RR-25-6002 - CO #1 - ATP #4 - Systemwide Pavement Repairs

Closes 11/26/2026Opened 10/28/2026

Illinois Tollway·Illinois

71% match

RR-26-2069 - Systemwide Pavement Repairs

Closes 12/10/2026Opened 10/31/2026

Texas Department of Transportation·Texas

71% match

LOCAL LET MAINTENANCE CONTRACT, WASHINGTON CO, MOWING HIGHWAY RIGHT OF WAY

Closes 11/18/2026Opened 10/22/2026

North Carolina Department of Transportation·North Carolina

71% match

54-TJK-09-PR39695, STATE ROUTE SHOULDER AND MEDIAN MOWING AND LITTER/DEBRIS REMOVAL

Closes 11/18/2026Opened 10/21/2026

Massachusetts City of Springfield·Massachusetts

71% match

27-059: Improvements to Forest Park Fitness Course

Closes 11/12/2026Opened 10/21/2026

Louisiana Jefferson Parish·Louisiana

71% match

2yr. Contract for Landscape Maintenance Within the Right-of-way

Closes 11/17/2026Opened 10/14/2026

Texas Department of Transportation·Texas

70% match

LOCAL LET MAINTENANCE CONTRACT, BEXAR CO, EROSION REPAIR

Closes 11/12/2026Opened 10/14/2026

Texas Department of Transportation·Texas

70% match

LOCAL LET MAINTENANCE CONTRACT, BANDERA CO, EROSION REPAIR

Closes 11/12/2026Opened 10/14/2026

Division of Highways·North Carolina

70% match

DF00566 – Milling, Resurfacing & Shoulder Reconstruction (Invitation to Bid)

Closes 11/4/2026Opened 10/14/2026