The City of Port Arthur is seeking bids for the renovation of the Port Arthur Downtown Pavilion. The bid tabulation section lists several bidders, along with their total costs, days to complete, and alternates. The bid opening date was March 21, 2012. The scope of work includes the removal of the stage from the base bid, the deduction of LED marquee screens from the building, and the deduction of exterior lighting from the Pavilion Facades. The contract is expected to be completed within 120 to 180 calendar days.
• The bid tabulation section lists six bidders, with total costs ranging from $453,000 to $770,147.
• The days to complete range from 120 to 180 calendar days.
• The bid tabulation section lists several alternates, including the removal of the stage from the base bid and the deduction of LED marquee screens from the building.