Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Texas guideTexas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Closed bids
  3. ›Texas
  4. ›Manufacturing
  5. ›Metal Floor Plate 1/8 X 48" X 96"

Awarded contract·Houston Airport System·Texas

Metal Floor Plate 1/8 X 48" X 96"

Won by [blank]$10kSingle Award
Contract source

Awarded vendors

  • [blank]

Description

This procurement calls for the purchase of 55 metal floor plates, each measuring 1/8 inch thick by 48 inches by 96 inches. The plates are to be delivered to the Supply Chain Management Warehouse at 18600 Lee Road, Humble, TX 77338. The solicitation is an informal bid, indicating a relatively straightforward acquisition with limited competition. The requirement emphasizes a light‑weight metal (not necessarily aluminum) that can be hung on a wall, suggesting a focus on structural yet manageable material. • Quantity: 55 plates; Size: 1/8" × 48" × 96" • Delivery location: Supply Chain Management Warehouse, 18600 Lee Road, Humble, TX 77338 • Procurement type: Informal Bid (likely non‑competitive) with no listed vendor details

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
5/29/2026
Contract modified
5/27/2026
Starts
5/22/2026

Last updated

Details

Award type
Single Award
Procurement
Other Than Full and Open Competition
Industry
Manufacturing
NAICS
332311
Solicitation №
INF-2026-0197

Contract value

$10,000

The plates are 1/8‑inch thick steel (approximately 10.5 lb per sq ft). Each 48″ × 96″ plate is about 32 sq ft, weighing roughly 336 lb. At an estimated market price of $0.30 per pound, material cost per plate is about $100, giving $5,500 for 55 plates. Adding typical contractor markup, handling, and delivery costs could raise the total to roughly $9,000–$12,000. A conservative midpoint estimate of $10,000 is therefore presented.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

U.S. Department Of Energy·California

Top match · 63%

Fabricated Components for the SR Embedded Floor Plates for the ALS-U Project

Closes 11/11/2026Opened 10/19/2026

U.S. Department Of Homeland Security·Maryland

62% match

STEEL PLATES

Closes 11/12/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

62% match

95--PLATE,METAL

Closes 11/8/2026Opened 10/29/2026

U.S. Department Of Defense·United States of America

62% match

PLATE,MOUNTING

Closes 11/30/2026Opened 10/30/2026

U.S. Department Of Defense·United States of America

62% match

95--PLATE,METAL

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·Texas

60% match

Anchor Plate, Wire R

Closes 12/2/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

60% match

95--PLATE,METAL

Closes 11/1/2026Opened 10/21/2026

U.S. Department Of Energy·Washington

60% match

MITR Chemically Milled Plate

Closes 12/4/2026Opened 10/27/2026

City of Cleveland·Ohio

60% match

578 - Gym Floor Cover

Closes 11/9/2026Opened 11/14/2025

Town of Westwood·Massachusetts

59% match

On Call Flooring

Rolling / TBD closeOpened 3/24/2026

U.S. Department Of Defense·North Dakota

59% match

Flooring IDR Pre-Solicitation Notice

Closes 10/31/2026Opened 10/16/2026

Hawaii Department of Transportation·Hawaii

59% match

Purchase of Threaded Keyhole Steel Plates

Closes 11/5/2026Opened 10/29/2026

Massachusetts City of Lawrence·Massachusetts

59% match

Cementitious-Urethane (Epoxy) Flooring

Closes 11/5/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

59% match

PLATE ASSY,RES (A3)

Closes 11/5/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

58% match

53--PLATE,MENDING

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

58% match

PLATE ASSEMBLY,STAU

Closes 11/16/2026Opened 10/22/2026

Massachusetts Department of Correction·Massachusetts

58% match

18-IND-7516-PLATESHOP

Closes 10/30/2033Opened 6/8/2018

Dillwyn Correctional Center·Virginia

58% match

Resinous Industrial Floor Coating Furnish and Install

Closes 11/23/2026Opened 10/21/2026

Texas Health & Human Services Commission·Texas

58% match

Rio Grande State Center needing removal and installation of flooring in Unit 1, Building 515

Closes 11/5/2026Opened 10/15/2026

Corrections and Community Supervision, NYS Dept. of·New York

58% match

Repair Cooler Floor

Closes 11/5/2026Opened 10/15/2026

Oregon Department of Corrections·Oregon

58% match

Two Rivers Correctional Institution Kitchen Floor Replacement

Closes 11/10/2026Opened 8/19/2026

U.S. Department Of Defense·United States of America

58% match

IDIQ Flooring

Closes 11/12/2026Opened 10/8/2026

U.S. Department Of Defense·Texas

58% match

20--PANEL FLOOR SECTION,WA

Closes 11/8/2026Opened 10/29/2026

Texas Department of Transportation·Texas

57% match

Force Plate SKID Truck Calibration for the MNT team

Closes 11/4/2026Opened 10/21/2026

U.S. Department Of Defense·United States of America

57% match

PLATE,METAL,METRIC and BEAM,H-SHAPE,METRIC for Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC), US Naval Base, Yokosuka, Japan.

Closes 11/3/2026Opened 10/25/2026