This contract calls for the complete wet‑method demolition of all structures at 107 Randolph Street, Mobile, AL, including removal of footings, slabs, and any building components, followed by site clearing, utility disconnection, erosion‑control BMP installation, hazardous‑material (lead‑based paint and asbestos) disposal, and final site stabilization. The contractor must also handle all required permits, maintain E‑Verify status, provide insurance per city standards, and publish a notice of final completion in a local newspaper.
• Wet demolition with dust suppression and full removal of structures, footings, and slabs.
• Utility caps, debris removal, vegetation clearing, and preservation of the existing aluminum fence.
• Installation of temporary erosion‑control measures, permanent seeding/soil stabilization, hazardous‑waste disposal, and required close‑out documentation.