This contract concerns the demolition of existing structures at 970 State Street, Mobile, AL, under a wet‑demolition method to control dust and address potential lead‑based paint or asbestos hazards. The scope includes utility disconnections and capping, full debris removal, extensive erosion and sediment control measures, and final site stabilization with topsoil, seeding, and mulching. The contractor must also handle hazardous‑material waste disposal, provide comprehensive documentation (photos, waste‑shipment records, insurance, E‑Verify proof), and publish a final‑completion notice in a local newspaper. The work must be completed within 30 calendar days after receipt of the notice‑to‑proceed, with liquidated‑damage provisions for delays beyond the stipulated period.