The contract is for a citywide street overlay project, which includes spot check base repairs, rolled sections of curb and gutter repairs, sidewalk and ADA curb ramp improvements, street overlay, and pavement marking improvements. The project is divided into two sections: Lipan Street from 19th Street to Palm Drive, and Columbia Street from Horne Road to Villarreal Drive. The engineer's estimate for the project is $820,422. The contract was awarded to multiple vendors, with the lowest bid being $909,536. The project is expected to be completed within 90 calendar days.
• The project includes two sections of street overlay
• The engineer's estimate for the project is $820,422
• The contract was awarded to multiple vendors
• The project is expected to be completed within 90 calendar days
• The project includes spot check base repairs, rolled sections of curb and gutter repairs, sidewalk and ADA curb ramp improvements, street overlay, and pavement marking improvements