The Power Inn Road Improvement Project involves the furnishing of all labor, materials, and equipment for clearing and grubbing, pavement grinding and overlay, tree stump removal, roadway excavation, installation of curb gutter & sidewalk, installation of roadway median, drainage pipes, manholes & inlets, slurry seal, aggregate base and asphalt pavement, traffic striping, street lighting foundation, signal interconnect conduit, landscaping and other incidental work. The estimated construction cost is $3,208,000, and the contractor license required is General Engineering. The bid opening summary lists five bidders, with Martin General Engineering, Inc. being the apparent low bidder with a total bid of $2,887,753.80.
• The project requires the furnishing of all labor, materials, and equipment for various construction activities.
• The estimated construction cost is $3,208,000.
• The contractor license required is General Engineering.
• The bid opening summary lists five bidders.
• Martin General Engineering, Inc. is the apparent low bidder with a total bid of $2,887,753.80.