The Black Bob Road Bridge Maintenance Project involves deck patching, median removal and replacement, epoxy polymer overlay on the bridge deck, fence repairs, and associated traffic control. The project was awarded to PCiRoads LLC, and the bid submission date was June 8, 2017. The project requires a satisfactory bid bond, and the successful bidder will be required to furnish and pay for satisfactory performance and payment bonds. Some key features of the project include:
• Reinforcing steel repair
• Stamped concrete median
• Curb on bridge
• Portland cement concrete overlay
• Mobilization
• Area prepared for patching
• Multi-layer polymer concrete overlay
• Drilling and grouting