This contract is for the installation of approximately 770 linear feet of 6 ft chain link fence with 3-strand barbed wire at the Twin City Pole Yard in Stanwood, WA. The project includes post foundations, posts, and two 20 ft gates. The engineer's estimate for the project is $83,850.00. The contractor must be on the District's Small Works Roster and prequalified for the category "Fencing/Gates/Automatic Gates/Overhead Doors" prior to bidding.
• The bid was awarded to Jti Commercial Services with a subtotal of $77,777.77.
• The bid opening was on August 2, 2022, at 2:00 p.m.
• The bid proposals are under evaluation.
• The contract is subject to change.