The S Royle Road Corridor Completion project involves the design and engineering of road improvements, including land surveying, roadway design, stormwater design, structural engineering, landscape design, and utility coordination. The project aims to improve the safety and functionality of the S Royle Road corridor. Key aspects of the project include:
• Performing topographic surveying and data collection services
• Conducting traffic analysis and developing a traffic demand and access management plan
• Providing design engineering services, including 95% plans and final plans
• Coordinating with utility companies to minimize project impacts
• Preparing a bank use plan and obtaining necessary permits
• Conducting cultural resource surveys and preparing reports
The project has a budget of $1,152,899.20 and is expected to be completed within 47 months.