This City of Spokane contract calls for the supply, modeling, and return of a stainless‑steel (316 SS) Nozzle Body Assembly on an as‑needed, annual basis for the Waste‑to‑Energy Facility. The city will provide one nozzle body (and a test insert) to the selected vendor, who must perform engineering/modeling work, then return the parts within two weeks at the vendor’s own cost and risk. Pricing is locked once the part is received; the contract includes a one‑time tooling/programming fee and tiered unit prices for each assembly ordered.
• Scope: Design‑model‑return service for 316 SS nozzle body; no purchase of the insert.
• Logistics: Vendor receives the part, completes work within 14 days, returns it (and insert) at its own expense; assumes full risk of loss.
• Financial: Engineer’s estimate ~ $5 k annually; one‑time fee $4,100–$9,823; unit prices $2,500–$4,700 per assembly (tiered).
• Procurement: Open Invitation to Bid (ITB 5404‑21) with optional pre‑bid site visit (April 21 2021) and clarification deadline (April 23 2021).