The Salt Storage Building bid was not awarded due to the lowest and best bid exceeding 10% of the engineer's estimate. The bid was for the construction of a salt storage building at the Bedford Reservation. The bid was posted on July 27, 2021, and the submission date was August 11, 2021. A pre-bid conference was held on August 4, 2021. The bid documents include a bid form, a salt storage bid tabulation form, and other related documents.
• The bid was not awarded due to the lowest and best bid exceeding 10% of the engineer's estimate.
• The bid was for the construction of a salt storage building at the Bedford Reservation.
• The bid was posted on July 27, 2021, and the submission date was August 11, 2021.
• A pre-bid conference was held on August 4, 2021.
• The bid documents include a bid form, a salt storage bid tabulation form, and other related documents.