The contract is for the construction of a 30” water transmission main, including associated piping, valves, permits, security, paving, and grading. The project is located in Sacramento, California, and the bid was awarded to Flowline Contractors, Inc. The engineer's estimate for the project is $1,207,200, and the contractor's California license and/or class required is Class "A" - General Engineering. The bid submission deadline was March 4, 2021, at 2:00 PM EST.
• The project includes the furnishing of all labor, materials, and equipment for construction.
• The contractor must have a Class "A" - General Engineering license.
• The bid was submitted by Flowline Contractors, Inc.
• The engineer's estimate for the project is $1,207,200.
• The project includes the construction of a 30” water transmission main.
• The bid submission deadline was March 4, 2021, at 2:00 PM EST.