This contract concerns the design‑build of a pocket park and intersection upgrades at the W. Kentucky Avenue and S. Irving Street corner in Denver. The scope includes demolition of existing concrete curbs and sidewalks, installation of new curb‑gutter bump‑outs with green‑infrastructure, construction of a new Denver Park with benches, shade structures, a basketball hoop, decorative walls, and a small basketball court, as well as extensive concrete, asphalt, landscaping, irrigation, and utility coordination work. The project was advertised with a virtual pre‑bid meeting on April 19 2022, a questions deadline of April 28 2022, and a bid opening on May 17 2022; however, no bids were received and the contract remains unawarded.
• Major work categories: demolition, concrete paving, curb‑gutter installation, asphalt resurfacing, landscaping, irrigation, and site furnishings.
• Estimated construction cost range: $1.55 M – $1.85 M (budget) with a bid‑summary total of $1,672,386.
• Pre‑qualification requirements: $3 M heavy‑civil or concrete‑sidewalk/curb‑gutter experience, MWBE goal of 19 %.