This contract concerns the demolition and replacement of the gymnasium floor at Elm Park Community School, including optional telescoping bleacher sections. The scope covers removal of existing flooring, moisture‑mitigation preparation, installation of a new wood athletic flooring system, associated VCT flooring, thresholds, and any required sub‑structure work. The awardee must provide all labor, materials, equipment, safety compliance, performance and payment bonds, insurance, prevailing‑wage payroll reporting, and adhere to Worcester’s Responsible‑Employer and MWBE requirements. The work must start within five days of contract execution and be substantially completed within sixty days.
• Scope: full gym floor demolition, moisture‑mitigation coating, new hardwood floor installation, optional bleacher alternates.
• Requirements: DCAM eligibility, 5 % bid bond, 100 % performance and labor bonds, extensive weekly payroll and workforce reporting, OSHA 10‑hour safety training, compliance with local noise and construction ordinances.
• Timeline: bid submission deadline June 1 2022; work must begin within 5 days of award and finish within 60 days.