The Traffic Loop Replacement Project involves the installation of traffic signal detector loops, detector handholes, conduit, pullboxes, and wiring. The project was bid on by four vendors, with St. Francis Electric submitting the apparent low bid of $357,547.00. The County of Sacramento is in the process of reviewing the bids. Key aspects of the project include:
• Installation of traffic signal detector loops
• Installation of detector handholes, conduit, pullboxes, and wiring
• Compliance with DBE requirements
• Attendance at a pre-bid meeting was considered in determining the bidder's good faith effort to obtain DBE participation
The project is being managed by the County of Sacramento's Construction Management and Inspection Division, with Jeff Lowry serving as the point of contact.